1 / 9

TC C4 Upgrade to C5 Project

TC C4 Upgrade to C5 Project. 30th Jun 2010. Traffic Parameter and Assumption. Busy days per year : 365days Busy hour to day ratio : 10% Traffic Off-net 90% of all traffics On-net 10% of all traffics Number of subs : 4.5K Average Holding Time Call Holding per call : 270 Sec.

sabina
Download Presentation

TC C4 Upgrade to C5 Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TC C4 Upgrade to C5 Project 30th Jun 2010

  2. Traffic Parameter and Assumption • Busy days per year : 365days • Busy hour to day ratio : 10% • Traffic • Off-net 90% of all traffics • On-net 10% of all traffics • Number of subs : 4.5K • Average Holding Time • Call Holding per call : 270 Sec. • BHCA per sub : 3 • Erlang per Sub : 0.225 • Offnet call via MGCF : 30% 2 |

  3. SOW for Equipment & Services • ICS SW license for up to 10K registered users, 1K concurrent users • CTS Silver residential package for 5K users Main offer: Equipment: WLEN IMS • Call Server (5060ICS): ~ 160K users 1 unit • 5900 MS 1 unit • Expand licenses of OMC-P and 7510 10 and 558 licenses WLEN Access • 7302 ISAM-V – 2K subs each 2 units • 7330 ISAM-V 5 units • ADSL2+ CPE 1368 units • 5520 AMS 1 unit IPD • 7750 SR-7 1 unit Others • Accessories (Rectifier, Battery, Rack, Patch cord, Power equipment, FDF and etc.) Services: • Local training (OJT and classroom training) • Site Survey • Installation& commissioning • Acceptance Test • Standard Warranty SW&HW (1 Yr) and Uplift Warranty RTS (1 Yr) • Spare part for ADSL2+ CPE (2% without repair and return) Option Offer: • Soft client – 5420 PCM -quoted • IP NMS – 5620 SAM not quoted

  4. Proposed Network Architecture: Access BRAS AAA CAMNET DNS SBC Kampong Cham CO (2K DSL subs) 7302 ISAM Internet 1GE 25.6 Mbps PSTN 2GE 7510 MGW 5GE 89.6 Mbps SDH* STM-16 backbone 7750 SR IP 5GE 5 * 1.22 Mbps 5060 ICS MGC-8 SDH ring* 1GE 1.22 Mbps VoIP Siem Reap Province (2K) 7302 ISAM 1GE 1.22 Mbps 1GE 25.6 Mbps 1GE 1.22 Mbps 1GE 1.22 Mbps 1GE 1.22 Mbps * Traditional SDH 5 sets of 7330 ISAM FTTN in PP

  5. Proposed Network Architecture: Core 5060 ICS 5420 CTS Residential Services 5450 ISC I-CSCF S-CSCF Transit iCCF iHSS DNS P-CSCF BGCF E-CSCF IBCF ILIDF 5900 MS MRFC MRFP 5450 IRC SPDF 5020 MGC-8 SG IBCF MGCF iAGCF AGCF Residential Business IP Operations and Maintenance Center OMC-P IP/MPLS Network POTS 7302/7330 ISAM-V ACMEPacket SBC H.323 & IP-Peering Network A-SBC/ I-SBC 7302/7330 ISAM 7510 MGW SGW IMS-MGW New Scope SS7 PSTN/ PLMN Expanded Scope

  6. Services & Features • Provides equivalent to existing C4 services • Standard CTS Silver residential package for Telephony and Supplementary Services • SIP – SIP, SIP – POTS, POTS – SIP and POTS - POTS calls from DSL subs • Network interconnection • IP Peering • PSTN circuit interconnection Although not within the Scope of Offer, system should be capable to support: • TDM PRA PBX and IP-PBX • Payphone and ISDN BRA

  7. BOM - ICS

  8. Project Implementation Plan

  9. www.alcatel-lucent.com

More Related