1 / 46

Nuclear Power and Climate Change

Nuclear Power and Climate Change. Adriana Mugnatto-Hamu adriana@danforthgreens.ca 416-273-8247 Climate Change Conference 2010 2010 August 14. Problems Joshua highlighted with nuclear power:. Long construction times Declining ore grades. Lifecycle CO 2 e of Electricity Sources. g-CO 2 e/kWh.

rania
Download Presentation

Nuclear Power and Climate Change

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Nuclear Powerand Climate Change Adriana Mugnatto-Hamu adriana@danforthgreens.ca416-273-8247 Climate Change Conference 20102010 August 14

  2. Problems Joshua highlightedwith nuclear power: • Long construction times • Declining ore grades

  3. Lifecycle CO2e of Electricity Sources g-CO2e/kWh Low Estimate High Estimate Reproduced with permission.http://stanford.edu/group/efmh/jacobson/renew_vs_nuclear.html

  4. Time Between Planning & Operation Nuclear: 10 - 19 y (life 40 y) Site permit: 3.5 - 6 y Construction permit approval and issue 2.5 - 4 y Construction time 4 - 9 years (Average today in China = 7.1 years) Hydroelectric: 8 - 16 y (life 80 y) Coal-CCS: 6 - 11 y (life 35 y) Geothermal: 3 - 6 y (life 35 y) Ethanol: 2 - 5 y (life 40 y) CSP: 2 - 5 y (life 30 y) Solar-PV: 2 - 5 y (life 30 y) Wave: 2 - 5 y (life 15 y) Tidal: 2 - 5 y (life 15 y) Wind: 2 - 5 y (life 30 y) Reproduced with permission.http://stanford.edu/group/efmh/jacobson/renew_vs_nuclear.html

  5. CO2e From Current Power Mixdue to Planning-to-Operation Delays, Relative to Wind g-CO2e/kWh Low Estimate High Estimate Reproduced with permission.http://stanford.edu/group/efmh/jacobson/renew_vs_nuclear.html

  6. Nuclear limitations for load shifting • no reactor on the planet can drop outputmore than 50% below the nominal • ability to vary outputdecreases over the fuel cycle • varying output by limiting the reaction increases risk ... • ... and decreases reactor lifespan • reducing output below the nominalfor significant amounts of timeincreases the cost of nuclear per kilowatt hour

  7. A coal plant must be running at capacity when it is replaced by a nuclear plant

  8. Nuclear reactors reduce emissions if • they replace existing reactorsat the end of their lives • or • they can be a small part of a suite of tactics to reduce many coal plants

  9. Total CO2e of Electricity Sources Low Estimate High Estimate Reproduced with permission.http://stanford.edu/group/efmh/jacobson/renew_vs_nuclear.html g-CO2e/kWh

  10. Reproduced with permission.http://stanford.edu/group/efmh/jacobson/renew_vs_nuclear.html

  11. Reproduced with permission.R. Kenny, C. Law, J.M. Pearce, Towards real energy economics: Energy policy driven by life-cycle carbon emission,Energy Policy, Volume 38, Issue 4, April 2010, Pages 1969-1978, ISSN 0301-4215, DOI: 10.1016/j.enpol.2009.11.078. (http://www.sciencedirect.com/science/article/B6V2W-4Y0K9WG-7/2/20bfb54fda02e08876ec8f8fcb7e48bc)

  12. Reproduced with permission.R. Kenny, C. Law, J.M. Pearce, Towards real energy economics: Energy policy driven by life-cycle carbon emission,Energy Policy, Volume 38, Issue 4, April 2010, Pages 1969-1978, ISSN 0301-4215, DOI: 10.1016/j.enpol.2009.11.078. (http://www.sciencedirect.com/science/article/B6V2W-4Y0K9WG-7/2/20bfb54fda02e08876ec8f8fcb7e48bc)

  13. Reproduced with permission.R. Kenny, C. Law, J.M. Pearce, Towards real energy economics: Energy policy driven by life-cycle carbon emission,Energy Policy, Volume 38, Issue 4, April 2010, Pages 1969-1978, ISSN 0301-4215, DOI: 10.1016/j.enpol.2009.11.078. (http://www.sciencedirect.com/science/article/B6V2W-4Y0K9WG-7/2/20bfb54fda02e08876ec8f8fcb7e48bc)

  14. But what about… • Footprint • Transition • Reliability • Cost

  15. But what about… • Footprint • Transition • Reliability • Cost

  16. "The amounts of fuel and waste that must be dealt with at a nuclear reactor can be up to one million times smaller than the amounts of fuel and waste at an equivalent fossil-fuel power station."

  17. Area to Power 100% ofU.S. Onroad Vehicles Wind-BEV Footprint 1-2.8 km2 Turbine spacing 0.35-0.7% of US Nuclear-BEV 0.05-0.062% Footprint 33% of total; the rest is buffer Cellulosic E85 4.7-35.4% of US Geoth BEV 0.006-0.008% Solar PV-BEV 0.077-0.18% Corn E85 9.8-17.6% of US Reproduced with permission.http://stanford.edu/group/efmh/jacobson/renew_vs_nuclear.html

  18. But what about… • Footprint • Transition • Reliability • Cost

  19. But what about… • Footprint • Transition • Reliability • Cost

  20. The wind doesn't always blow and the sun doesn't always shinewhen you need them to • Nuclear output is steady

  21. Meeting peak demand • Solar power • Storage • Biofuels • Carbon capture • Hydro power • Load shifting

  22. But what about… • Footprint • Transition • Reliability • Cost

  23. Reproduced with permission.R. Kenny, C. Law, J.M. Pearce, Towards real energy economics: Energy policy driven by life-cycle carbon emission,Energy Policy, Volume 38, Issue 4, April 2010, Pages 1969-1978, ISSN 0301-4215, DOI: 10.1016/j.enpol.2009.11.078. (http://www.sciencedirect.com/science/article/B6V2W-4Y0K9WG-7/2/20bfb54fda02e08876ec8f8fcb7e48bc)

  24. Matching Hourly Summer 2020 Electricity Demand with 100% Renewables(No Change in Hydro) Power (MW) Total Demand Hydro Solar Wind Geothermal

More Related