An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Micro-hydro Power Alvin Chan, Benjamin Garber, Lance Stratton, Philip Pulitzer Advisor: G Flo

  2. Outline • To install a microhydro system at Springfield Plantation Guesthouse. • Reasons for installation • Standard microhydro sighting • Calculate flow rate and head • Power calculations based on flow rate and head • Location of system • Training • Power usage and economical/environmental advantages • Other organizations • Maintenance and training (personal and locals) • Equipment • Turbine (hydro unit) • Pipe • Costs (limitations) • Funding

  3. Standard Micro-hydro Sighting Prior Measurements needed to take before installing : -Head and flow rate (Potential Energy) -Expect fluctuations in flow (80-120 gallons/minute) -Turbine must be able to handle flow rate how to take flow rate : 1) use a bucket and stopwatch to measure (small) 2) Float method (large)

  4. The Stream This is a picture of the stream taken from the road.  The pipe and the intake are on the other side of the road and that is where the majority of the work will be done.

  5. Partially Completed Intake

  6. Choosing a Location • Location avoid damage over time to area’s geography • Site Problem: flooding by nearby Check Hall River  chose location a few feet from the river Second proposed project: few feet from river, actual chosen location First proposed project site: deemed too dangerous

  7. Training Protocol: Standard training will be provided by UVM.  More information will be provided by the equipment manufacturer.

  8. Economic Advantages • Cost effective back-up energy production • Initial investment could be recovered in less than 3 years • Turbine could last decades with proper maintenance Environmental Advantages • Micro-hydro system diverts less than half of stream flow • Renewable energy source that does not pollute the air or water • Operates over wide range of head and flows

  9. Equipment Needed: Turbine (SES-P175 Turbine Unit) Generator PVC Piping Wire to connect to load governor Wire conduit Dump load Intake Foundation and housing for turbine unit

  10. Why use this type of turbine? • Designed to operate on wide range of head and flow conditions • Covers head and flow calculated previously • Turbine sized for specific site based on head and flow conditions. • System can be used to augment power and as back-up power supply.

  11. HYDRAULIC COMPONENTS OF TURBINE: • hydroelectric generator • WATER DELIVERED TO TURBINE BY PVC PIPE: • Length is approx 480 ft. • 4 inch diameter • Approx cost $1600

  12. Other Equipment • Belts for the belt drive • To be purchased separately • Generator • Included with turbine unit • Oil filled pressure gauge at the inlet to the turbine • To measure water pressure • To be purchased separately • Voltmeter • Included with turbine controls • Gate Valve • To be purchased separately

  13. Funding Funding has been provided by several different sources: State University of New York: College of Environmental Science and Forestry University of Vermont: CDAE Clemson University: Archbold Consortium SCEPTRE (Springfield Center for Environmental Protection, Training, Research and Education)