Trd ride along bottle
Download
1 / 8

TRD Ride Along Bottle - PowerPoint PPT Presentation


  • 59 Views
  • Uploaded on

TRD Ride Along Bottle. Ground Safety Review – Phase III February 22-24, 2010 Phil Mott. The ride along bottle keeps the TRD straws slightly above 1 atm to prevent them from possibly collapsing under a negative pressure. (mission success) Standard off-the-shelf Luxfer Gas Cylinder

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' TRD Ride Along Bottle' - phillip-todd


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Trd ride along bottle

TRD Ride Along Bottle

Ground Safety Review – Phase III

February 22-24, 2010

Phil Mott

AMS-02 GSR Phase III


Overview

The ride along bottle keeps the TRD straws slightly above 1 atm to prevent them from possibly collapsing under a negative pressure. (mission success)

Standard off-the-shelf Luxfer Gas Cylinder

MDP = 200 Bar

Test = 300 Bar

Material = Al 6061-T6

Weight = 24.5 lbs empty

All hardware will be removed in the SSPF prior to AMS installation into the canister.

All hardware will be reinstalled at the pad IF launch abort or hurricane rollback.

All hardware uses captive fasteners.

Overview

AMS-02 GSR Phase III


Trd ride along bottle

AMS-02 GSR Phase III atm to prevent them from possibly collapsing under a negative pressure. (mission success)


Trd ride along bottle

AMS-02 in Pad Orientation atm to prevent them from possibly collapsing under a negative pressure. (mission success)

SFHe Fill Port

Sill Trunnion

Sill Trunnion

Zenith Radiator

TRD Ride Along Bottle

Y

X

Sill Trunnion

Sill Trunnion

AMS-02 GSR Phase III


Trd ride along bottle

AMS-02 GSR Phase III atm to prevent them from possibly collapsing under a negative pressure. (mission success)


Trd ride along bottle

Sill Trunnion atm to prevent them from possibly collapsing under a negative pressure. (mission success)

Radiator

Sill Beam

TRD Ride Along Bottle

Sill Trunnion

AMS-02 GSR Phase III


Trd ride along bottle

AMS-02 GSR Phase III atm to prevent them from possibly collapsing under a negative pressure. (mission success)


Trd ride along bottle

AMS-02 GSR Phase III atm to prevent them from possibly collapsing under a negative pressure. (mission success)