10 likes | 107 Views
Learn essential commands to change material data in SAP ZMM02Z. Ensure P2 status on Basic Data 1 view before updating to prevent data loss. Discover vital procedures for an organized vehicle fleet management in DPI.
E N D
Change Material Master ZMM02Z Basic Commands Back Cancel Help Exit Enter Save Execute The material can be changed from Obsolete only if the P2 is not on the Basic Data 1 view. If it is in Gray on the Basic Data 1 screen, the material is really obsolete and the new number to be used is in the description of the old material on the same view. DPI Vehicle Fleet Management IM-2