1 / 25

SWIM-SUIT Project Overview

SWIM-SUIT Project Overview . Giuliano d’Auria SELEX Sistemi Integrati Project Coordinator. ATM Network. SWIM. Technical Enabler. Technical Enabler. Technical Enabler. Technical Enabler. Why SWIM-SUIT?. SWIM is a key enabler of the future ATM vision. ATM Network. IM. SW.

parson
Download Presentation

SWIM-SUIT Project Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SWIM-SUITProject Overview Giuliano d’Auria SELEX Sistemi Integrati Project Coordinator SWIM-SUIT User Forum, Rome

  2. ATM Network SWIM Technical Enabler Technical Enabler Technical Enabler Technical Enabler Why SWIM-SUIT? • SWIM is a key enabler of the future ATM vision SWIM-SUIT User Forum, Rome

  3. ATM Network IM SW Technical Enabler Technical Enabler Technical Enabler Technical Enabler Why SWIM-SUIT? • How strong are the foundations? SWIM-SUIT User Forum, Rome

  4. Specification of the requirements for the SWIM implementation Validation of the technologies identified as enablers of the SWIM concept SWIM FEASIBILITY Assessment of the Organisational, Legal and Financial Implications SWIM Prototype SWIM-SUIT Objectives SWIM-SUIT User Forum, Rome

  5. Consortium Composition SWIM-SUIT User Forum, Rome

  6. Consortium Composition SWIM-SUIT User Forum, Rome

  7. Consortium Composition SWIM-SUIT User Forum, Rome

  8. Consortium Composition SWIM-SUIT User Forum, Rome

  9. Consortium Composition SWIM-SUIT User Forum, Rome

  10. Consortium Composition SWIM-SUIT User Forum, Rome

  11. Consortium Composition SWIM-SUIT User Forum, Rome

  12. Consortium Composition SWIM-SUIT User Forum, Rome

  13. Consortium Composition SWIM-SUIT User Forum, Rome

  14. Consortium Composition SWIM-SUIT User Forum, Rome

  15. Consortium at a Glance 10 Countries 20 Partners 6 Industries 1 Airport Managing Company 2 Airlines 2 ANSPs 4 SMEs 2 Research Centres 1 University • User Group • Support: • Budget: • 11,8 M€ • 6,3 M€ funded by EC 15 SWIM-SUIT User Forum, Rome

  16. The positioning of SWIM-SUIT SESAR Development Phase SWIM WP8-14 SWIM-SUIT FAA SWIM OATA MCS FOIPS CFMU FOS OATA ICOG SESAR Definition phase 16 SWIM-SUIT User Forum, Rome

  17. The Road to SWIM-SUIT Design Validation Integration Requirements Financial & Institutional ECEuropean Commission WP0 WP4 Validation WP5 Financial and Institutional WP1 Information Management Users Requirements WP2 SWIM Design, Development and Testing WP3 Test Bed Integration and Testing 17 SWIM-SUIT User Forum, Rome

  18. The Road to SWIM-SUIT Design Validation Integration Requirements Financial & Institutional ECEuropean Commission WP0 User Group WP4 Validation WP5 Financial and Institutional WP1 Information Management Users Requirements WP2 SWIM Design, Development and Testing WP3 Test Bed Integration and Testing 01/10/2009 18 SWIM-SUIT User Forum, Rome

  19. SWIM-SUIT Prototype AOC Flight Simulator AOC FMS ACC/APP ISPOC Prototype ATFCM (CFMU) USA SWIM MXP AIRPORT Heathrow A-CDM ACC EAD Acquire Data 19 SWIM-SUIT User Forum, Rome

  20. SWIM-SUIT Prototype AOC Flight Simulator AOC FMS ACC/APP ISPOC Prototype ATFCM (CFMU) USA SWIM MXP AIRPORT Heathrow A-CDM ACC EAD Disseminate Data 20 SWIM-SUIT User Forum, Rome

  21. SWIM-SUIT Prototype AOC AOC FMS ACC/APP USA SWIM ACC EAD Flight Simulator ATM Virtual Information Pool AVI POOL ISPOC Prototype ATFCM (CFMU) MXP AIRPORT Heathrow A-CDM 21 SWIM-SUIT User Forum, Rome

  22. SWIM SUIT:Achievements and Next Steps D.1.4.1: Information Security Requirements D.1.2.1: • Information Content • & Services Requirements • D.1.5.1: • Overall SWIM Users Requirements D.1.3.1: D.1.6.1: SWIM Prototype Requirements D1.6.3 Preliminary Validation Plan • Preliminary FHA report 1 1 1 2 2 2 3 3 3 4 4 4 2007 2008 2009 2010 1 2 3 4 WP1 WP2 WP3 WP4 WP5 01/10/2009 22 FABEC CDSTF Meeting SWIM-SUIT User Forum, Rome

  23. SWIM SUIT:Achievements and Next Steps D.2.2: Report on candidate technology and service options D.2.3.1: Information Model and Services D.2.4.2: SSDD D.5.2.2: Cost benefit analysis Methodology • D.4.2.1: • Validation Plan 1 1 1 2 2 2 3 3 3 4 4 4 2007 2008 2009 2010 1 2 3 4 WP1 WP2 WP3 WP4 WP5 01/10/2009 23 FABEC CDSTF Meeting SWIM-SUIT User Forum, Rome

  24. SWIM SUIT:Achievements and Next Steps • D.5.3.1: • Organisational and Legal implications • D.5.2.4 - D.5.2.7 • CBA • D.1.7.1: • Overall SWIM Users Requirements - Final • D.4.5.1: • Lessons Learned and Recommendations • D.4.4.1: • Validation Report 1 1 1 2 2 2 3 3 3 4 4 4 2007 2008 2009 2010 1 2 3 4 WP1 WP2 Prototyping Sessions Validation WP3 WP4 WP5 01/10/2009 24 FABEC CDSTF Meeting SWIM-SUIT User Forum, Rome

  25. Questions and Feedback http://www.swim-suit.aero/swimsuit/ SWIM-SUIT User Forum, Rome

More Related