Mission Trajectory Step 1

Mission Trajectory Step 1. From planning to deployment. The SESAR concept. SESAR Steps are capability-based (not fixed in time). Step 3 Performance-based Operations. Step 2 Trajectory-based Operations. Step 1 Time-based Operations. Deployment Baseline (formerly: IP1).

orea
Download Presentation

Mission Trajectory Step 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mission Trajectory Step 1 From planning to deployment

  2. The SESAR concept SESAR Steps are capability-based (not fixed in time) Step 3 Performance-based Operations Step 2 Trajectory-based Operations Step 1 Time-based Operations Deployment Baseline (formerly: IP1)

  3. SESAR : Business/Mission Trajectory • 4D Mission Trajectory same principles as Business Trajectory but enables complex military operations: • Airspace reservations part of trajectory definition • Synchronisation of multiple trajectories for complex missions • Formation flights with trajectory split/join up • Confidentiality & security requirements of exchanges between WOC-NM-aircraft-ATC 4D Business Trajectories data linked and negotiated between AOC-NM-aircraft-ATC Trajectory negotiation 4DT 4DT 4DT 4DT 4DT 4DT

  4. Mission Trajectory Business/Mission Trajectory Not a new way to fulfill missions - A new way to share information, negotiate trajectories and allocate airspace during planning cycles and execution phase, - A new way for flights description, richer than today’s Flight Plan - A new way to provide Air Navigation Services - A new challenge for civil/military coordination

  5. Civil military airspace management systems to distribute planned airspace usage & airspace status and to allow more modular airspace structures. • Harmonised military flight planning & aeronautical information systemsto support improved “Operational Air Traffic” • Secure gatewaysto interconnect military systems to the ATM network • Uplink & downlink of trajectory datathrough data link (Transport type only for time based operations) • Enhanced airborne navigation and surveillance systems (Transport type only for time based operations) Technical Enablers Main Step 1 system changes in support of Mission Trajectory & Network performance • Mission Trajectory requirements • Unrestricted access to airspace for high priority missions • Operational Air Traffic Transit Service across Europe • Sufficient airspace for training • Confidentiality & security • Compatibility with FABs & NM • Network Shortcomings • Lack of Airspace management flexibility (inability to exploit capacity opportunities) • Lack of integration of Network, ATC and AOC/WOC operations (limited reliability of available information by different actors) implies: • Limited predictability • overprotection in term of capacity, • Local actions with negative impact on Network • 2 hours gap between ATFM and ATC (limited flexibility and reactivity)

  6. Mission trajectory development Baseline ASM local simulation/negotiation Projects 7.5.2 13.2.1 ATC ASM simulation/negotiation Based on flight intents A/C Project 7.5.2 7.6.2 13.2.1 15.2.10 ATC ATFCM ASM simulation/negotiation Based on Mission requests Project 7.6.2 11.1.1 STEP 1 WOC ATFCM ATC Aircraft Meteo

  7. Main challenges Level 1 Level 3 Performances & Maturity Analysis, Business cases Master Plan Common Projects (Business view) CFT Network Strategy Plan Implementation Projects ESSIP • Monitoring execution • Ensuring Consistency • Trigger and support corrective actions Level 2 7

  8. Planning exercise/No CBA • Prioritisation based on: • Mission trajectory needs • Network performance • synchronisation

  9. Military priorities • deployment decision taken • no need for Cost Benefit analysis * maturity linked to PBN mandate

  10. Deployment based on European ATM Master Plan • Refined Performance needs • Refined Cost Benefit Analysis • Updated with R&D results and maturity checks • With updated OIs/enablers/lines of action