1 / 25

Presentation of UFAB

Presentation of UFAB. Agenda. A contract manufacture within these areas of expertise. 13 000 Hours. 28 000 Hours. 35 000 Hours. 48 000 Hours. The Mattsson group. Founded: 1961 Turnover: 35 MEUR Employees: 200 Operates in: Uddevalla Gothenburg Säffle Shanghai.

nikki
Download Presentation

Presentation of UFAB

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presentation of UFAB

  2. Agenda

  3. A contract manufacture within these areas of expertise 13 000 Hours 28 000 Hours 35 000 Hours 48 000 Hours

  4. The Mattsson group • Founded: 1961 • Turnover: 35 MEUR • Employees: 200 • Operates in: • Uddevalla • Gothenburg • Säffle • Shanghai

  5. Presentation overview - references

  6. Siemens • Machining • Welding • Heat treatment • Advanced manufacturing

  7. National OilwellVarco • Subsea • Offshore • Marine

  8. GE Healthcare • High volume production • Flexible production • Medicine • Lean production

  9. TT3 • Complete production • Product testing • Full scale testing before delivery

  10. GKN • Project team • Communication • Prototype • Engineering • Competence • CAD • Simplicity

  11. Presentation overview – Our way of work

  12. MD • Joacim Johansson • Sales • Engineering • Logistic • Production • QA System • HSE Our way of work • Packaging • Mechanical • Automation • Documentation • Purchasing • SupplierQuality • Technique • In House Quality • Improvements • Management Sys. • CustomerQuality • Medical • Mechanical • Automation • Documentation • Purchasing • SupplierQuality • Technique • In House Quality • Improvements • Management Sys. • CustomerQuality • Energy • Mechanical • Automation • Documentation • Purchasing • SupplierQuality • Technique • In House Quality • Improvements • Management Sys. • CustomerQuality • Manufacturing • Mechanical • Automation • Documentation • Purchasing • SupplierQuality • Technique • In House Quality • Improvements • Management Sys. • CustomerQuality

  13. UFAB and the world

  14. Our factory in Uddevalla • Development and Assembly • High technical processes • LEAN production (Cost reduction)

  15. Our factory in Shanghai • Manufacturing • Milling, turning & welding • 2 shift operation • Long purchasing experience

  16. Presentation overview – Capacity

  17. Capacity 13 000 Hours 28 000 Hours 35 000 Hours 48 000 Hours

  18. Capacity – Construction 13 000 hours • DFM Design For Manufacturing • DFA Design For Assembly • ProEngineer, Inventor, SolidWorks, Frame Maker, ELCAD

  19. Capacity – Welding 28 000 hours • 5 000 m² • License • Stainless steel • Low volume / High volume

  20. Capacity – Machining 35 000 hours • 2 100 m² • Low volume – Complex • Machine parts

  21. Capacity – Assembly 48 000 hour • 5 500 m² • Europe • China

  22. Presentation overview – Finish

  23. Together we´re stronger

  24. Customer references

  25. What can we do for you?

More Related