This joint design review assesses the new TF Flag Joint design, identifies shortcomings, confirms viability, and releases fabrication activities. Review focused on the TF Flag Joint, inner leg, flag, fasteners, structural supports, and hub assembly. Recovery activities, design, analysis, and testing activities were completed. Notable improvements include re-designed shear shoes, a segmented torque collar, and precision measurements. Further agenda items include resolution of chits by the team.
E N D
BACKGROUND • TF joint failed on February 14, 2003 due to structural weaknesses • At the April 10, 2003 review….. • cause of failure was explained • new design was presented • sufficient confidence was gained to proceed with conductor machining • Since April the analysis, testing, and design has been completed • chits generated during the April review have been resolved • Purpose of this review is to examine the final design • identify any shortcomings which may need correction • Additional review in September will assess cost and schedule • today’s review will establish that the technical basis is sound
PURPOSE OF REVIEW • Obtain critique of new design of the TF Flag Joint • Identify any shortcomings needing attention (chits) • Confirm viability of TF Flag Joint Design • Allow release of all fabrication and assembly activities
SCOPE OF REVIEW • TF Flag Joint and Integrated Assembly • Inner Leg / Flag Interface (the joint) • Flag • Flag Fasteners (threaded inserts, studs, washers, nuts, etc.) • Flag Structural Supports (Boxes, Shear Shoes) • Hub Assembly/Torque Collar • Built-in Instrumentation Features Other aspects may be discussed but are out of scope
REVIEW PROCEDURES • Chits to be submitted to Chairman B Nelson • Chits to be dispositioned by Review Board • Chits to be resolved by Cog Engr C Neumeyer C. Neumeyer* P. Peterson, GA P. Titus, MIT P. Anderson, GA L. Dudek J. Irby, MIT B. Nelson,ORNL** • G. Voss, Culham • ** Chair • * Ex-officio • Remote participant
DESIGN 3D modeling complete, including… • integrated TF inner leg bundle • coolant tube routing and bulkhead • outer leg connections Fabrication drawings complete, including… • conductors • flags • flag boxes • shear shoes • hub assembly • torque collar
ANALYSIS Structural FEA complete, including… • both tiers of conductors • out-of-plane load path through spline • collar and wet lay-up representation • in-plane, out-of-plane, thermal loads • SOFT, EOFT, EOP cases • Other analysis complete, including… • force calculations • temperatures, including joint temperature rise • fastener sizing calculations • miscellaneous calculations • Formal documentation and checking • is not complete at this time
TESTING • Component testing (design input data) consists of: • Pull-out tests on threaded inserts • - one time and 50,000 cycle at 100oC • Pull-out tests on bolts threaded in copper • - one time and 50,000 cycle • Friction coefficient and electrical resistance tests • Shear tests on torque collar attachment • Status: Complete • Prototype testing (design verification) consists of: • Mechanical mock-up tested for 50,000 cycles • Electrical mock-up tested at full current and I2T • Status: In Preparation
HIGHLIGHTS SINCE APRIL • Structural FEA completion • greater insight into thermal-induced behavior • Shear Shoe re-design • Torque Collar - Three segment collar - Torsion-only design (de-coupled vertical and radial loads) • Improved epoxy wet lay-up • Voltage probe using commercial spring-loaded probe • Precision measurement of contact resistivity vs. pressure • Component tests completed