1 / 9

Communications Infrastructure Committee

Communications Infrastructure Committee. Update for the IAC Friday, April 15, 2011. Initial Building List. Occupational Therapy Clark - Done* Shepardson - Done* ARBL - Done* Engineering NESB A/Z VTH Atmospheric Science * Single GigE for now. Issues and Difficulties.

natala
Download Presentation

Communications Infrastructure Committee

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Communications Infrastructure Committee Update for the IAC Friday, April 15, 2011

  2. Initial Building List • Occupational Therapy • Clark - Done* • Shepardson - Done* • ARBL - Done* • Engineering • NESB • A/Z • VTH • Atmospheric Science • * Single GigE for now IAC Update

  3. Issues and Difficulties • Switch Consistency (Type and Configuration) • Documentation (Change mgmt., ports, vlans) • Security (Physical and Virtual) • Resources • Hardware inventory • People – delegation of responsibilities (configurations, responding to outages, etc.) • Multi-departmental occupancy of buildings • New technologies • Radiation Safety Project • VoIP – exacerbated by all of the above IAC Update

  4. Issues and Difficulties (Cont’d) • 900+ switches • 120+ MDFs/IDFs • 40,000+ systems • Video, Environmental Controls, Power Meters, Voice, Police/Fire, Security Panels, Servers, Wireless, Private College LANs, etc… • Main campus, West Campus, South Campus, Remote sites comprising • 213 Subnets • 60 Subnet managers

  5. IAC Update

  6. IAC Update

  7. Small sample and examples of concerns • Environmental controls offline due to multicast storm, After hours response by Facilities, April 2011 • Looped network takes down environmental controls requiring reconfiguration of switches and further monitoring after hours by Facilities, NOC, April 2011 • Firewall not configured to be on network and thus not firewalling, March, 2011 • Several building networks down along with environmental controls due to dual-homed server misbehaving. Discovered hubs and other devices as part of debug process. March, 2011 • VOIP and Wireless down due to cables being moved to wrong switch ports. March, 2011 • Compromised machines swamp entire LAN affecting police/fire, March 2011 • Departmental servers down, nobody knew location of switches affecting servers nor configuration of switches thus requiring NOC to respond, find, fix, March, 2011 • Unit carrying police/fire notifications moved to wrong port on switch. After hours response by NOC, Facilities, Feb. 2011 • Lost communication on large campus network due to switches being plugged into each other incorrectly. Feb. 2011 • Network device with duplicate IP takes down a College’s central server, Feb 2011 • Emergency fiber run had to be made to bypass departmental network device incapable of handling vlans for cardkey access, Feb, 2011

  8. Directive, from VPIT • Must ‘harden’ our network for future applications, including VoIP IAC Update

  9. Discussion • Is most welcome IAC Update

More Related