1 / 41

AP Dept. - Activities Report

AP Dept. - Activities Report. 1) SNUMI Phase 1 and Phase 2 civil designs/estimates (status) 2) Offsite reviews; NSF/DUSEL, upcoming LCLS/SLAC 3) SciBooNE Construction 4) Final thoughts on Proton Driver/HINS civil designs - and a comment on AD proposed extension to MI-65 over the proposed

miriamh
Download Presentation

AP Dept. - Activities Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AP Dept. - Activities Report 1) SNUMI Phase 1 and Phase 2 civil designs/estimates (status) 2) Offsite reviews; NSF/DUSEL, upcoming LCLS/SLAC 3) SciBooNE Construction 4) Final thoughts on Proton Driver/HINS civil designs - and a comment on AD proposed extension to MI-65 over the proposed PD/HINS 8 GeV transfer line location5) Comment on Mu2E as a follow on to SNUMI Phase2 6) Comment on Fermilab to DUSEL neutrino lines Dixon Bogert - AP Dept. Meeting September 20th, 2006 AP Dept. Activities Report September 20, 2006 Dixon Bogert

  2. SNUMI - Phase 1 SNUMI is sometimes referred to as the “McGinnis Plan”. The intention is to increase the power on the NuMI Neutrino target in the assumed absence of the Proton Driver. SNUMI utilizes modifications to existing Fermilab facilities after the completion of collider physics at the end of FY09. SNUMI is planned to occur in two phases. The first phase will use the Recycler Ring to slip stack 12 Booster batches of protons into six slots and then single turn transfer them into the Main Injector. The Main Injector will then spend minimal time at 8 GeV and the Main Injector cycle is reduced to about 1.33 seconds. The power on the NuMI Target will then be about 700 kilowatts. A second injection line from the Booster to FMI 8 GeV line will be constructed for injection into the Recycler, while preserving the existing injection line to the FMI. AP Dept. Activities Report September 20, 2006 Dixon Bogert

  3. SNUMI - Phase 2 AP Dept. Activities Report September 20, 2006 Dixon Bogert

  4. Civil Requirements - SNUMI Phase 1 • MI-14 Kicker Building at MI-10 • MI-39 Kicker Building at MI-40 • 4th Anode Supply Room at MI-60 • Buss Bar Insertion at MI-60 • DOE Space Management Offsets • Cost estimates and construction schedules for above items AP Dept. Activities Report September 20, 2006 Dixon Bogert

  5. Proposed MI-14 Site Near MI-10 As of 9/18/06 AP Dept. Activities Report September 20, 2006 Dixon Bogert

  6. Section thru MI-14 Site Near MI-10 MI-14 As of 9/18/06 AP Dept. Activities Report September 20, 2006 Dixon Bogert

  7. Proposed MI-39 Site Near MI-40 As of 9/18/06 AP Dept. Activities Report September 20, 2006 Dixon Bogert

  8. Section thru MI-39 Site Near MI-40 MI-39 As of 9/18/06 AP Dept. Activities Report September 20, 2006 Dixon Bogert

  9. 4th Anode Supply Room Location at MI-60 Possible blast/fire wall is required here. Additional 4-bay switch almost certainly required MI-60 Hi-Bay MI-60 Lo-Bay AP Dept. Activities Report September 20, 2006 Dixon Bogert

  10. Buss Bar Insertion at MI-60 Note interference with roof purlin beam AP Dept. Activities Report September 20, 2006 Dixon Bogert

  11. Civil Requirements - SNUMI Phase 2 • Additional Cooling Pond at MI-60 Ponds A/B • AP-4/AP-5 – Accumulator Connections • Passive Radiation Shielding as possible • DOE Space Management Offsets • Cost estimates and construction schedules for above items AP Dept. Activities Report September 20, 2006 Dixon Bogert

  12. Additional Cooling Pond Location at MI-60 Pond B Pond “X” Pond A MI-60 AP Dept. Activities Report September 20, 2006 Dixon Bogert

  13. AP-4/AP-5 – Accumulator Connections AP Dept. Activities Report September 20, 2006 Dixon Bogert

  14. Phase 2 – Accumulator Connections (Cont.) AP Dept. Activities Report September 20, 2006 Dixon Bogert

  15. Phase 2 – Accumulator Connections (Sketch) AP Dept. Activities Report September 20, 2006 Dixon Bogert

  16. Phase 2 – Accumulator Connections (Utilities) AP Dept. Activities Report September 20, 2006 Dixon Bogert

  17. FESS Deliverables AP Dept. Activities Report September 20, 2006 Dixon Bogert

  18. DOE Space Offsets AP Dept. Activities Report September 20, 2006 Dixon Bogert

  19. Reviews for NSF and DOE (1) AP Dept. Activities Report September 20, 2006 Dixon Bogert

  20. Reviews for NSF and DOE (2) AP Dept. Activities Report September 20, 2006 Dixon Bogert

  21. SciBooNE Civil Construction SciBooNE is an experiment that is moving the “SciBar” Detector from Japan to the United States for a test run before returning it to Japan for installation at JPARC. The detector is to be installed 100 meters downstream of the MiniBooNE Target at MI-12. The excavation for the detector enclosure is starting in the immediate future; Notice to Proceed was gi8ven to the contractor last Tuesday, Sept 19th, and the contract is for beneficial occupancy in 90 days, on December 11th. The work is shown in the following two slides. AP Dept. Activities Report September 20, 2006 Dixon Bogert

  22. SciBooNE Civil Construction Mini BooNE Target SciBooNE Detector 100 meters AP Dept. Activities Report September 20, 2006 Dixon Bogert

  23. SciBooNE Detector AP Dept. Activities Report September 20, 2006 Dixon Bogert

  24. Putting the Proton Driver “on the shelf” The Proton Driver electronic drawings are all filed. A wetlands delineation report in south half of Main Ring infield will be presented next Wednesday, 9/27/06, and filed. A soil borings report will be presented next Wednesday, 9/27/06, and filed. The Accelerator Division/Mech Support Department is looking for space to consolidate neutrino horn/target production/testing in addition to MI-8. They are proposing a south extension onto the existing MI-65 (NuMI Target Service Building.) This conflicts with the route of the Proton Driver 8-GeV line. AP Dept. Activities Report September 20, 2006 Dixon Bogert

  25. AD is considering extending MI-65 to the South AP Dept. Activities Report September 20, 2006 Dixon Bogert

  26. AD is considering extending MI-65 to the South MI-65 South Extension here AP Dept. Activities Report September 20, 2006 Dixon Bogert

  27. AP4 Line SNUMI Phase 2 makes Mu2E possible • The beam is slow spilled extracted from the Debuncher at either D30 or D50 • At D30, the extracted beam goes towards AP3 • At D350, the extracted beam heads northwest A-D Line AP5 Line AP Dept. Activities Report September 20, 2006 Dixon Bogert

  28. Location of Mu2E target and detector Target Giese Road Detector AP-10 AP-30 AP-50 Extracted Beam Line From Debuncher MI-8 AP Dept. Activities Report September 20, 2006 Dixon Bogert

  29. Neutrino Beams for DUSEL are possible AP Dept. Activities Report September 20, 2006 Dixon Bogert

  30. Neutrino Beams for DUSEL are possible AP Dept. Activities Report September 20, 2006 Dixon Bogert

  31. Backup Slides Additional Information is found in the following slides AP Dept. Activities Report September 20, 2006 Dixon Bogert

  32. SNUMI MI-14 Kicker Building AP Dept. Activities Report September 20, 2006 Dixon Bogert

  33. MI-39 Kicker Building at MI-40 AP Dept. Activities Report September 20, 2006 Dixon Bogert

  34. F17 is a model for these Buildings These drawings are taken from Project 6-6-8A AP Dept. Activities Report September 20, 2006 Dixon Bogert

  35. 4th Anode Supply Room at MI-60 AP Dept. Activities Report September 20, 2006 Dixon Bogert

  36. 4th Anode Supply Room Location at MI-60 AP Dept. Activities Report September 20, 2006 Dixon Bogert

  37. 4th Anode Supply Room/blast wall at MI-60 AP Dept. Activities Report September 20, 2006 Dixon Bogert

  38. Buss Bar Insertion at MI-60 AP Dept. Activities Report September 20, 2006 Dixon Bogert

  39. Additional Cooling Pond at MI-60 Ponds A/B AP Dept. Activities Report September 20, 2006 Dixon Bogert

  40. Phase 2 – AP-4 Connection - 8 GeV Exit Point AP Dept. Activities Report September 20, 2006 Dixon Bogert

  41. Phase 2 – AP-4 Connection - 8 GeV Exit Point AP Dept. Activities Report September 20, 2006 Dixon Bogert

More Related