Physical I&IT Infrastructure Proposal

Physical I&IT Infrastructure Proposal. Presentation to the UTFAB Monday, November 8 2004, 5-6:30 PM, Library Tom Maher, Dir. of OIS, T om.Maher@Colostate.edu , 1-1325 Andre Smith, Manager, CSS-OIS, Andre.Smith@Colostate.edu , 1-1325. Outline. Background

marika
Download Presentation

Physical I&IT Infrastructure Proposal

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Physical I&IT Infrastructure Proposal Presentation to the UTFAB Monday, November 8 2004, 5-6:30 PM, Library Tom Maher, Dir. of OIS, Tom.Maher@Colostate.edu, 1-1325 Andre Smith, Manager, CSS-OIS, Andre.Smith@Colostate.edu, 1-1325

  2. Outline • Background • Classrooms – status regarding technology • Peer institutions • Current Year 1 & 2 Plans • Status • Budget • 3-yr. plan • Analysis – “fit” with UTFAB funding criteria • Q&A Classroom Technolopgy Status

  3. Background

  4. CSU GA Classrooms Status • 154 total GA (General Assignment) classrooms at CSU • All have Internet access • 74 have technology (49%) • Insufficient number to meet a growing demand • Need more mid to small-sized classrooms with computer projection systems • Many have old, dim projectors and older optics resulting in a less sharp image • New computer projector technology can avoid expensive lighting modifications Classroom Technolopgy Status

  5. Comparison to Peers – GA Classrooms with Technology • CU Boulder has 160 GA classrooms – about the same number as CSU • About 100 (60%) have computer projectors • About 30 of these (20%) have “all the bells and whistles” • AHEC in Denver has 100% of GA classrooms equipped with technology Classroom Technolopgy Status

  6. Status of FY 04 Plan-Completed

  7. FY 04 Plan Approved by UTFAB • Refresh technology in 17 smart classrooms where old technology exists • New projectors are brighter and sharper, and function with modern laptop computers • To avoid maintenance and repair problems • Mixture of upgraded projectors, document cameras, podiums, control systems, etc. • Build 7 new smart classrooms by adding computer projection systems • Total approved – $117K (reduced from $175K and then to $102k) • Completed Classroom Technolopgy Status

  8. Status of Project for FY 05

  9. Classroom Prioritization • Physical Development Plan (PDP) Process • Departments prioritize their PDP elements and forward to their Vice President (VP) • Each VP reviews department submissions, establishes their priorities and forwards to the University PDP Committee • The University PDP Committee reviews VP submissions, and establishes University priorities • Classroom elements are forwarded to the Classroom Review Board (CRB) for their recommendations and actions Classroom Technolopgy Status

  10. Classroom Prioritization (cont’d) • The CRB reprioritizes, and allocates resources to projects • Due to budget cuts, all CRB resources are consumed by non-IT elements • Chairs, lighting, carpeting, white boards, ADA, etc. • CRB recommendations integrated into the University physical I&IT prioritization process • Building rewires, classrooms, and wireless Classroom Technolopgy Status

  11. Status: Technology Upgrades Classroom Technolopgy Status

  12. Status: Technology Refresh Classroom Technolopgy Status

  13. Summary of Proposal for FY 05 • 11 rooms for new technology • 5 rooms for technology refresh • 720 student seats total, mostly smaller rooms to meet most pressing demand • Project is ahead of schedule and on budget Classroom Technolopgy Status

  14. FY 05 University Cost Share • Agreement was that for every $1 of student funding for classroom infrastructure, the University would fund $1 of building rewires • Completed VTH rewire @ > $580,000 • 8 additional buildings, in process • AERC, Alder Hall, GSB, Industrial Science, NRRL, Painter Center, Physiology, Spruce Classroom Technolopgy Status

  15. 3-Year Plan

  16. 3-Year Plan or Process • That the UTFAB consider funding technology in classrooms for 3 additional years, for both some new rooms and some technology refresh • 21 New rooms (7 annually plus 11 in FY05) • 24 rooms for technology refresh (8 annually after 5 in FY05) • 120 (78%) total smart rooms by Fall 2008 Classroom Technolopgy Status

  17. UTFAB Funding Criteria • Benefit as many students as possible • Est. 20,000+ students will pass through these classrooms in any single semester • CSUIITE eventually will benefit all students, faculty and staff • Current rewire proposal mostly benefits occupants of Wagar, Music and VTH, but the network is bi-directional • Ability to effectively utilize the fee - judgment • Not funded by CFT - correct • Adherence to budget and accountability – quotations for classroom equipment, accounting in arrears for rewires • Potential for direct student use - judgment • Effort and thought reflected in the plan - judgment • Justification and clarity of the project plan - judgment Classroom Technolopgy Status

  18. Summary Thank you for your support. Discussion and questions are most welcome. Classroom Technolopgy Status