1 / 25

Overview of the PBN Airspace Implementation Processes

Overview of the PBN Airspace Implementation Processes. BEIJING, CHINA; 30 JUN-11 JUL 2014. General Information. SSID: Public@ICAOBeijing PWD: Welcome2icao. Schedule Overview. Schedule Overview. Overview. Learning Objective:

maille
Download Presentation

Overview of the PBN Airspace Implementation Processes

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overview of thePBN Airspace Implementation Processes BEIJING, CHINA; 30 JUN-11 JUL 2014

  2. General Information • SSID: Public@ICAOBeijing • PWD: Welcome2icao

  3. Schedule Overview

  4. Schedule Overview

  5. Overview • Learning Objective: • Understand the Processes involved in the planning, design, validation and implementation of a PBN Airspace Concept • This presentation will discuss • The activities that lead up to the implementation of a PBN Airspace Concept.

  6. ICAO PBN Manual Doc 9613 • Volume I • Airspace Concept • Implementation Processes • Volume II • Navigation Specifications

  7. ICAO Manuals Airspace Design is documented in ICAO Manual Doc 9992 – Manual on The Use of Performance-Based Navigation (PBN) in Airspace Design

  8. ICAO Manuals CCO and CDO are documented in ICAO Manuals Doc 9993 – Continuous Climb Operations Manual Doc 9931 - Continuous Descent Operations Manual

  9. PBN Implementation Processes High-level sequential outline of processes to use when considering PBN implementation

  10. PBN Implementation Processes

  11. PBN Enables the Airspace Concept NAVIGATION APPLICATION NAVIGATION SPECIFICATION NAVAID INFRASTRUCTURE Airspace Concept COM NAV ATM SUR PBN

  12. Navigation Specification by Flight Phase OCEANIC / Enroute Remote (nonSUR) RNAV 10, RNP 4, RNP 2, Advanced RNP 2 RNAV 1/2 & RNP 1 STARs ARNP 1 STARs RNAV 1/2 & RNP 1 SIDs ARNP 1 SIDs RNP Approach RNP-AR Approach RNAV 5/2/1 RNP 2 Advanced RNP 2 or 1 Enroute Continental

  13. Airspace Concept

  14. Overview • Learning Objective: • Understand the Airspace Concept • This presentation will discuss • What is an Airspace Concept • Why develop an Airspace Concept • Who develops an Airspace Concept • What is needed to develop an Airspace Concept • What happens after the Airspace Concept is developed.

  15. PBN Concept Review RNAV X RNP X RNAV RNP 1 NAVIGATION APPLICATION (Use of NS & NI) 3 2 NAVIGATION SPECIFICATION NAVAID INFRASTRUCTURE (Ground- Space-based) (RNAV System Perf.) X X Accuracy value

  16. RNAV and RNP RNP 1 RNAV 1 Alert to Pilot 1 Nautical Mile 95% of flight time Track Centerline 1 Nautical Mile 95% of flight time RNP is not different from RNAV: it is more than RNAV The Key Extra Ingredient: On-Board Performance Monitoring and Alerting

  17. PBN Enables Airspace Concepts NAVIGATION APPLICATION NAVIGATION SPECIFICATION NAVAID INFRASTRUCTURE Airspace Concept Airspace Concept COM NAV ATM SUR PBN

  18. Strategic Goals (Expected Benefits) Safety? Capacity? Efficiency? Environment? Access? Airspace Concept Airspace Concept COM NAV ATM SUR NAVIGATION APPLICATION PBN NAVIGATION SPECIFICATION NAVAID INFRASTRUCTURE RNP RNAV

  19. What is an Airspace Concept? • A master plan of the intended airspace design and its operation • Describes the intended operations within an airspace • Developed to satisfy explicit and implicit strategic objectives (improved safety, increased air traffic capacity, improved efficiency, mitigation of environmental impact) • A fully developed Airspace Concept: • Describes in detail the airspace organization and its operations • Addresses all the strategic objectives identified for the project • Addresses all CNS/ATM enablers • Identifies all operational and technical assumptions

  20. Why develop an Airspace Concept? • Airspace Concept development provides a structured and systematic way of determining • Whatis to be achieved in an airspace, and • How it will be achieved • The development process helps ensure • Goals (expected benefits) of planned airspace structure are clearly stated; • Objectives of the airspace change are met; and • The means to achieve these goals are appropriate and feasible within the resources available to the airspace system

  21. What does it look like? • An Airspace Concept can be in any document format • Maintain configuration control!

  22. What is the most critical point in developing an Airspace Concept? Setting the appropriate objectives and scope • Enables the project team to remain focused and the budget to be managed within the set time • Most projects which fail to meet the intended goal do so because of poorly defined scope and objectives. • Beware of project creep!

  23. Once the Airspace Concept is developed, what’s next? • Lay out a detailed program plan for the specific implementation(s) in the Airspace Concept • ICAO sample action plans (domain-specific and comprehensive) • Consider just as a starting point • Adapt as needed to the specific circumstances of a project • Steps not always conducted in strict sequence • Certain steps may be conducted on a recurring basis as the project progresses • Steps and the sequence in which they are performed in the project should be evaluated by the implementation team on the basis of experience and judgment

  24. Airspace Concept Summary PBN

  25. Questions??

More Related