This document provides a comprehensive summary of the Q4 2007 Engineering Review for the LBT project. The draft of the System Overview and Operations & Maintenance manual is complete, pending minor edits. An internal review was conducted on December 20th, and the Document Tree database has been completed. Current efforts are focused on ensuring all drawings meet the correct format. The next steps include submitting documents for review by January 2008 and finalizing all documents by mid-February 2008.

leora
Download Presentation

LBT Q4 2007 Engineering Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LBT Q4 2007 Engineering Review PMCD

  2. Highlights (Q4/2007) • Draft of System Overview and O&M manual complete except for minor edits. • Steward Internal review held Dec 20th. • Document Tree database complete and drawings are being reviewed for correct format and revised where necessary. • Document Tree being reformatted into hierarchical form. • Current Completion Date is February 2008. LBT Q4 2007 Engineering Review

  3. Open Issues • Technical • None • Schedule • Current due to availability of LBT Engineering Group to participate in final review. • Financial • None • Resource • None LBT Q4 2007 Engineering Review

  4. Progress (Q4/2007) • Complete System Overview and O&M Manual Draft and Submit for Review (Planned Dec) (Draft complete except for minor edits will submit for review in January) • Complete Drawing Tree and Drawing Revisions (Jan) (Still planned for January) • Complete Final docs (Jan) (Still planned for January) LBT Q4 2007 Engineering Review

  5. Planning (Q1/2008) • Complete System Overview and O&M Manual Draft and Submit for Review (Jan) • Complete Drawing Tree and Drawing Revisions (Jan) • Complete Final docs (Jan) • Final Review meeting Feb, 13th. LBT Q4 2007 Engineering Review