CamCube Interim Review 2

CamCube Interim Review 2. ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida. Overview. Project Summary Resolved Issues Design Summary Current Issues to be Resolved Schedule Progress Budget Progress. Project Summary. Multi-year goal

lel
Download Presentation

CamCube Interim Review 2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CamCube Interim Review 2 ASEN 4028 – March 15, 2004 Sam Baker Tom Freestone Brian Madge Brian Roberts Steve Pfau Jen Uchida

  2. Overview • Project Summary • Resolved Issues • Design Summary • Current Issues to be Resolved • Schedule Progress • Budget Progress

  3. Project Summary • Multi-year goal • Design a pico-satellite around the CubeSat program guidelines. The satellite will be launched from the shuttle and orient itself in order to take pictures of the heat tiles with an onboard camera. • Current year goal • Develop an attitude control system that will orient the satellite and keep the on board camera steady for pictures.

  4. Project Summary • Reaction Wheel • Testing in a single axis • Possibility of testing in two axes • Dual Disk testing apparatus • Applied torque from the reaction wheel • 3-axis Gimbal • 2-axes will be locked for the single axis test • Measuring stability, slew rate, response to applied forces

  5. Resolved Issues • Machining Time • Most parts complete • 1 part left to fabricate • Battery mounting bracket

  6. Design Summary – Cube

  7. Design Summary – Cube

  8. Design Summary – Dual Disk

  9. Current Issues • Load cell • Miscalculation of force from desired torque numbers • Ordered new load cell (came in this morning) • Each test only takes about 8 seconds • Increase output voltage to the motion controller by 1mV every millisecond

  10. Dual Disk Results

  11. Dual Disk Results • Wrong load cell • Noise • ~5mV output • ~15 mV noise • Wobble in reaction wheel • Torque from wire

  12. Current Issues • Wobble analysis • Nutation angle,  • Shaft displacement from center of RW • Non-uniform mass • Nutation • Number of precessions per revolution • Negative => retrograde

  13. Budget Progress – Estimated Budget

  14. Budget Progress – Actual Budget

  15. Questions?