1 / 15

GEOSS AIP-2 Development Interim Design Review Disaster WG

GEOSS AIP-2 Development Interim Design Review Disaster WG. Stu Frye Didier Giacobbo Alexandre Robin (as alternate) Valencia 2 December 2008. Overview. Objectives Disaster Cycle Disaster WG Activity Disaster Scenario Overview Future steps. Objectives.

clark
Download Presentation

GEOSS AIP-2 Development Interim Design Review Disaster WG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GEOSS AIP-2 Development Interim Design Review Disaster WG Stu Frye Didier Giacobbo Alexandre Robin (as alternate) Valencia 2 December 2008

  2. Overview • Objectives • Disaster Cycle • Disaster WG Activity • Disaster Scenario Overview • Future steps

  3. Objectives • Help space community understand specific needs of disaster management community, as well as operational mechanisms and interactions (local, provincial and national) • Collect information on needs of users to establish requirements • Establish ‘virtual constellation’ of satellites to address each phase of disasters, working through existing bodies such as International Charter and CEOS

  4. Disaster Cycle Tailored Solutions in Each Phase • For Response, broaden International Charter by inviting GEO Member states to designate authorized users; encourage new Charter membership • For Mitigation/Warning/Recovery, use pilot project approach with selection of regional champions that can integrate satellite data; organize volunteer contributions on mission-by-mission basis; define global “baseline” imaging scenario

  5. Disaster WG Activity • First Flood Pilot teleconference was held on 28 October • Need for local/regional and global approaches • Smaller scale regional allow for broader use of different data types (in situ ,socio-economic data and High Resolution satellites) • The global approach allow to access systems that can be used rapidly and anywhere in the world. • Possible example for scenario was outlined • Flood Pilot for the annual flood season in Africa • Miramar flood study that overlaid flood and population maps

  6. Disaster WG Activity • GEOSS AIP-2 DM Email list • The address was sent to over 100 collaborators who can potentially contribute to the AIP-2 effort. • https://lists.opengeospatial.org/mailman/listinfo/aip_disasters • A day-to-day collaborative workspace • https://sites.google.com/site/geosspilot2/Home/disaster-response-working-group • First draft of Disaster Scenario released • https://sites.google.com/site/geosspilot2/Home/disaster-response-working-group/disaster-wg-documents

  7. Disaster WG Activity: Collaborative workspace

  8. Disaster Management Scenario Overview

  9. Disaster Management Scenario Brief Summary • As states on the GEO Task DI-06-09, • weather satellites have made contributions to disaster warning and prevention and particularly hydrological disasters. • Dozen of Earth Observations systems that should be part of the system, both for accurate warning system (mainly from low resolution satellite) or to generate accurate map after the disaster to assist responders. • One objective of the scenario is to make a link between global system (based on Weather satellites) and local/regional system (based on Low High resolution satellite and In Situ sensors).

  10. Disaster Management Scenario Actors • Decision maker who needs to affect resources (Initiator) • E.g. International Disaster Charter • Regional civil protection preparing to face a natural disaster or looking for information on a daily basis to react (Actuator) • Data provider providing information and/or data to regional civil protection (Processor) • The public looking for information either to face the situation or to find out what can be done to help (Public)

  11. Disaster Management Scenario Context and pre-conditions • User requirements for flood analysis using the EO data

  12. Disaster Management Scenario Scenario Events (monitoring before event) • Step 0 The Initiator (INI) searches for services about potential flood by accessing Geoss Portals • Step 1 The INI identifies a map based on Global Flood Potential Model and asks Regional Civil Protection (RCP) to monitor his AOI • Step 2 RCP asks Global Data Provider (DP) as NOAA • provides global real time data over a given area • informs INI about possible flood event • Step 3 INI contacts RCP in order to activate monitoring on daily time • Step 4 RCP delivered daily Flood Map products to INI

  13. Disaster Management Scenario Scenario Events (activation during and post event) • Step 5 Based on new event, INI provides authorization for asking more resource as accurate data • Step 6 RCP request DP for imagery pre and after damage • Step 7 DP provides feasibility acquisition • Step 8 RCP accepts one or more DP acquisition proposal • Step 9 One or more DP acquire image or extract from archive and make it available (pre and after) • Step 10 RCP accesses the data and should ask other company for data processing • Step 11 Data are processed and delivered to RCP and INI • Step 12 Map produced are released by INI and used for • public communication by INI • evacuation plan by RCP • damage assessment by RCP

  14. Example of Flood Sensor Web ScenarioProduct Service Chain Global Flood Potential Model – based TRMM and other satellites -Adler Univ. of Md High resolution optical Daily MODIS Flood Map - Brackenridge, Dartmouth Flood Observatory Envisat Flood Map - Kussul, Skakun, National Space Agency of Ukraine High resolution SAR such as TerraSAR Multi-sensor campaign manager -GSFC et al MODIS Global Water Mask Univ. of Md –Sohlberg

  15. Disaster WG Activity : future steps • Review and finalize the Disaster Scenario • Evaluate existing Flood Pilot • Annual flood season -> Bob Adler (University of Maryland) volunteered to forward his flood map presentation to the entire group • Miramar flood study -> Contact Yuri Gorokhovich for more information on this study. • Pursue effort to encourage participants to enter their components and services into the GEOSS registry a • Have a list of components and services that are in development and planned to come on-line during the Pilot timeframe ->co-chairs to keep this list and contact participants • E.g. Jaxa for ALOS • Start coordination with Transverse WGs

More Related