Background

Background. Loss of production from dam construction/operation Habitat loss, migration barrier, exotic predators/competitors Beamesderfer et al. 1995 , Parsley and Beckman 1994 , DeVore et al. 1995 , North et al. 1993 Increase subsistence fishing opportunities

lareau
Download Presentation

Background

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Background • Loss of production from dam construction/operation • Habitat loss, migration barrier, exotic predators/competitors • Beamesderfer et al. 1995, Parsley and Beckman 1994, DeVore et al. 1995, North et al. 1993 • Increase subsistence fishing opportunities • In kind, out of place mitigation • Measure 10.4A.5 (NPPC 1995) • Put, grow, and take sturgeon fishery • Cultured and/or wild fish transfer

  2. Goal • Quantify and assess critical uncertainties limiting the planning and development of a put, grow, and take white sturgeon fishery in Oxbow and Hells Canyon reservoirs. Mid-Snake sub-basin summary (pg 117)

  3. Brownlee 5665 ha Oxbow 468 ha 19 km Hells Canyon 980 ha 35 km

  4. Hells Canyon Reservoir

  5. Collaborative Process • ODFW • Jeff Zackel • Tome Rien • Ray Beamesderfer • IPC • Jim Chandler • Ken Lapla • U of I Genetics Lab • Paul Anders • ISRP (ISRP2000-7) • IDFG • Don Anderson • Tim Cochnauer • Nez Perce Tribe • Dave Statler • Nancy Hoefs • Rick Orme • CRITFC • Blaine Parker • Chris Beasely

  6. Feasibility ? • Minimal entrainment of stocked sturgeon thereby achieving and maintaining a harvestable population in the project area. • Sufficient growth and survival (production) to achieve and maintain a harvestable population of sturgeon. • Appropriate long term source to achieve and maintain a harvestable population. • Minimal risk to the down stream sturgeon population.

  7. Experimental Population 750 sturgeon (14 fish / km) • 500 Hells Canyon, 250 Oxbow Reservoir • PIT tag and externally marked Collaborative Process with Co-managers • Appropriate initial source of cultured and/or wild sturgeon

  8. Entrainment • Entrainment • Maintain 50 sonic tags in Hells Canyon, 25 in Oxbow Reservoir (10% of experimental population) • Monitor Hells Canyon forebay and tail race with stationary recording receivers • Entrainment Potential • Mobile surveys in Oxbow/Hells Canyon • Seasonal habitat use, travel time and distance • Entrainment of sturgeon from Oxbow

  9. High Potential Moderate Potential Low Potential • Daily Travel • Season • Water Year • Limnology

  10. Production • Bi-annual sampling • Set lines, angling • Stratify effort according to density (tracking data) • Survival • Mark re-capture estimators, CPUE, sonic tags • Intensive mark re-capture in third year • Growth • Quantify individual growth and population biomass

  11. Stock Source • Location, type (wild/cultured) • Genetic makeup (BPA project 19902200) • Long term availability • Number and available age classes • Potential disease concerns • Acquisition and transport costs

  12. Assessing Risk • Entrainment • Parameters • Entrainment, seasonal habitat use, duration and timing of spill, travel time and distance, limnological variables • # stocked vs # down stream • Fishery Potential • Parameters • survival, growth, catch rates, entrainment • Stocking vs Harvest (numbers / biomass) • Genetic Risk • Parameters • Stock source, survival, entrainment, age at maturity, stocking density, Ne of source and wild population • Probability of genetic effect