Project: Bratislava – Flood protection Ing. Deana Hirnerová, Ing. Jaroslav Sabo

Project: Bratislava – Flood protection Ing. Deana Hirnerová, Ing. Jaroslav Sabo. dea.hirnerova@svp.sk. Flood in August 2002. Bratislava – the key point in flood protection of south Slovakia. Project: Bratislava – Flood protection Amount and Rate of Cohesion Fund assistance:

kking
Download Presentation

Project: Bratislava – Flood protection Ing. Deana Hirnerová, Ing. Jaroslav Sabo

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project: Bratislava – Flood protection Ing. Deana Hirnerová, Ing. Jaroslav Sabo dea.hirnerova@svp.sk

  2. Flood in August 2002

  3. Bratislava – the key point in flood protection of south Slovakia

  4. Project: Bratislava – Flood protection Amount and Rate of Cohesion Fund assistance: 26 552 936 EUR 85% Application worked-out for the CF assistance: July 2004 EC Decision date: December 2005 Land permit and Tender procedures: December 2006 Commencement of the works: May 2007 Completion of the project: December 2010

  5. Project objectives: • Adequate protection from floods of the population • potentially affected by floods in project area • Prevention of economic damages in the project area • including capital city Bratislava and municipalities in the Žitný ostrov area • Prevention of environmental damages in the project area including prevention of contamination of drinking water sources and agricultural soil.

  6. The project is divided into 9 Activities: The Danube River- left bank Activity 1: Construction of the Flood Protection Line in the section Pristavny Bridge – Apoll Bridge Activity 2: Construction of the Flood Protection Line in the section Stary Bridge – Novy Bridge Activity 3: Construction of the Flood Protection Line in the section Confluence with the Vydrica Brook – confluence with the Cierny Brook Activity 4: Construction of the Flood Protection Line in the section Danube River in the Devin suburb The Morava River- left bank Activity 5: Construction of the Flood Protection Line in the section the Morava River in the Devin suburb Activity 6: Construction of Flood Protection Line in the section the Morava River in the Devinska Nova Ves suburb. The Danube River- right bank Activity 7: Construction of the Flood Protection Line in the section Stary Bridge- Flood protection dike Petržalka (SK) Wolfsthal (A) The Danube River- Gabcikovo Hydropower Project Activity 8: Enhancement of safety of the left-side dike of the tailwater canal of Gabcikovo Hydropower Project Equipment Activity 9: Supply of Measuring and Data Processing equipment (measuring vessel)

  7. PROJECT AREA 6b 8 6a 5 4 3 2 1 Projectedfloodprotectionline 7

  8. Slovak Republik • Bratislava Capital city of Slovak Republik 500 000 inhabitants Devín suburb Devínska Nová Ves suburb • 13 km length of Danube river • 5 km length of Morava river 5 bridges Morava Q30 = 1 040 m3.s-1 + Devínska Nová Ves Devín Q100 = 11 000 m3.s-1 Bratislava Small Danube Danube Q1000 = 13 500 m3.s-1 Čunovo Austria Propeler rkm 1868,75 Requested security freeboard of the construction over the proposed water level + 0,50 m Danube Hungary

  9. Slovak Republik • Bratislava Proposed method of the protection Adjustment of the bank line - used components • Mobile pumping set • Closing objects • Pumping stations • Mobile elements • Flood protection (abutment) wall • Earth dike • Underground sealing screen • Underground constructed wall Morava Q30 = 1 040 m3.s-1 + Devínska Nová Ves Devín Q100 = 11 000 m3.s-1 Bratislava Small Danube Danube Q1000 = 13 500 m3.s-1 Čunovo Austria Propeler rkm 1868,75 Requested security freeboard of the construction over the proposed water level + 0,50 m Danube Hungary

  10. Activity 1: Construction of the Flood Protection Line in the sectionPristavny Bridge – Apollo Bridge

  11. Activity 2: Construction of the Flood Protection Line in the section Stary Bridge – Novy Bridge

  12. Activity 3: Construction of the Flood Protection Line in the section Confluence with the Vydrica Brook– confluence with the Čierny Brook

  13. Activity 4: Construction of the Flood Protection Line in the section Danube River in the Devin suburb

  14. Activity 5:Construction of the Flood Protection Line in the section the Morava River in the Devin suburb

  15. Activity 6: Construction of Flood Protection Line in the section the Morava River in the Devinska Nova Ves suburb

  16. Activity 7: Construction of the Flood Protection Line in the section Stary Bridge- Flood protection dike Petržalka (SK) Wolfsthal (A)

  17. Activity 8: Enhancement of safety of the left-side dike of the tailwater canal of Gabcikovo Hydropower Project

  18. Activity 9: Measuring equipment with vessel

  19. Thankyouforyourattention www.ba-ppo.sk