An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Objective ITY-AGDL ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR 19.09.2014

  2. Comprehensive Explanation (1/3) • This OBJ covers the implementation of initial datalink services based on air-ground (ATCO  Pilot) point-to-point data communications as specified by Regulation • 29/2009 EC (data link services). • Scope: EU+ States = EU+CH+NO+ECAA • MIL:Only 1 non-mandatorySLoA on State a/c equipage ESSIP Plan 2014 / Objective ITY-AGDL

  3. Comprehensive Explanation (2/3)(=> Mandatory REG and ASP related SLoAs) ESSIP Plan 2014 / Objective ITY-AGDL

  4. Comprehensive Explanation (3/3)(=> Non-mandatory SLoAs) ESSIP Plan 2014 / Objective ITY-AGDL

  5. Link to European ATM Master Plan • [AUO-0301] - Voice Controller-Pilot Communications (En Route) Complemented by Data Link; • [CTE-C2a] - Air-Ground existing data link (VDL2 and AOA); • [ER APP-ATC154] - Basic air-ground data link communications service derived from the CM and CPDLC applications; • [PRO-044b] - ATC Procedures involving protocol for utilization of Data Link communications, message composition, receipt acknowledgement; • [ER APP-ATC119] - Enhance Air/Ground Data Communication for Step 1 CPDLC. ESSIP Plan 2014 / Objective ITY-AGDL

  6. Finalisation Criteria and Closed Questions • Various – see detailed breakdown in ESSIP Plan 2014. ESSIP Plan 2014 / Objective ITY-AGDL

  7. Supporting Material • Various – see ESSIP Plan 2014 ESSIP Plan 2014 / Objective ITY-AGDL

  8. ESSIP Report 2013 • Only three states out of eight, the airspace of which belongs to the Part A of the regulation, with a deadline of 02/2013, have completed the objective. Most of the states, the airspace of which belongs to Part B, with regulated completion deadline 02/2015, and ECAA States, have planned to implement the objective, within the deadline, except three states which have not yet developed any plans; • Four States have reported the objective Completed and fifteen have planned to complete the objective within the ESSIP deadlines while twelve States have reported it Late. 6 States reported not yet plans developed for implementation. ESSIP Plan 2014 / Objective ITY-AGDL

  9. Links and contacts • Objective Coordinator: Adriatik Kokona, +32 2 729 3556 adriatik.kokona@eurocontrol.int • DNM Objective Expert(s): SorenDissing , +32 2 729 3446 soren.dissing@eurocontrol.int ESSIP Plan 2014 / Objective ITY-AGDL