Docking and Attachment Test Norway - December 13, 2010. HiLoad during DP Operation – November 2010. Approach to Submersible Barge on DP. Attachment System Activated Maneuvering of Barge by HiLoad DP. HiLoad during DP Operation – November 2010. First Ballast Test – Oct 2010.
E N D
Docking and Attachment Test Norway - December 13, 2010 HiLoad during DP Operation – November 2010
Attachment System Activated Maneuvering of Barge by HiLoad DP
HiLoad DP No. 1 – In Operation HiLoad DP No. 1 in Transit to Test Location on the West Coast of Norway HiLoad DP at 42 m draught (138 feet) HiLoad DP No. 1 at “Sea Trial Base” in Norway
42.0 m 42.0 m Min draught 17.0 m 27.0 m 28.0 m HiLoad DP No. 1 in Transit to Test Location on the West Coast of Norway HiLoad DP No. 1 at “Sea Trial Base” in Norway