MAGIC e MAGIC II. Alessandro De Angelis Universita’ di Udine e INFN Commissione 2 INFN, Frascati, 5 Luglio 2005. Stato di MAGIC MAGIC II Richieste. MAGIC.

1 / 22

Download Presentation

MAGIC e MAGIC II

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MAGIC e MAGIC II Alessandro De Angelis Universita’ di Udine e INFN Commissione 2 INFN, Frascati, 5 Luglio 2005 Stato di MAGIC MAGIC II Richieste

  2. MAGIC • Collaborazione di 17 istituzioni: Italia(~28%),Germania (~36%), Spagna (~24%),Russia, Polonia, Armenia, Finlandia, USA, Ucraina, Svizzera, Bulgaria. • Sito: La Palma, Canarie, 2200 m slm • Obiettivo principale: rivelazione di sorgenti g VHE (>30 GeV, lo IACT con soglia piu’ bassa al mondo) • Rivelatore : IACT,17 m , 240 m2 di specchi di raccolta (il più grande al mondo). Field of view: 3.5 – 3.8 gradi • Camera: 577 pixels, di 2 tipi (1” e 2” – risoluzione sul punto di 0.5 mrad) • Risoluzione angolare sulle sorgenti: ~0.1 gradi (verificata su Crab) • Movimento rapido (~20s) per puntare sui GRB

  3. MAGIC e i suoi concorrenti Montosa Canyon, Arizona VERITAS (USA,UK1…)1: Oct ’03 4: 2006? 100 m2 (7) CANGAROO III (Japan & Australia)2: Dec. ’02, 3: Early ’04 57 m2 (4) Windhoek, Namibia HESS (Germany & France)2: Sum ’02 4: Early ’04 100 m2 (16) Woomera, Australia Già finanziato un 5^ grande telescopio per abbassare la soglia (->MAGIC) MAGIC (Germany, Italy & Spain)1: Autumn ‘03240 m2 (2) Roque delos Muchachos, Canary Islands

  4. MAGIC in configurazione finale (240m2) da settembre 2004 [NIMA 518 (2004) 188] • Tecnica di analisi • Prime analisi [NIMA 516 (2004) 511] ~300Hz shower rates Eth ~40GeV

  5. Present running conditions May: ?? June: ??

  6. Osservazione di Crab in settembre 04 Gamma ray event rate ~1Hz After hadron rejection ~0.5Hz For Crab ~20σ/ hr1/2

  7. Crab 50-75 GeV Crab T ~ 64 min Signal = 20 s.d. • Crab: sensibilità di circa 20 s/ora • E’ visibile segnale a partire da 50 GeV • Quasi background-free a 500 GeV

  8. Risultati e piano delle pubblicazioni • 31 Papers sent to ICRC • Will serve as a basis for publications, deadline Oct 14 • Technical papers: subsystems and their performance • Tracking and pointing, camera, mirrors, DAQ, etc. • Overall performance • Physics papers (2/7 coordinated by italians) • 1ES1959+650 (draft circulating) • Crab (wobble, ON/OFF, lightcurve, spectrum, comparison with other experiments) • Mkn421 (lightcurve, spectrum, multiwavelength) • Mkn501 • 1ES 1218+304 • HESS 1813 • SgrA*

  9. Crab (paper to ICRC) MAGIC Preliminary g (MAGIC) Misurato su 20 decadi Synchrotron I.C. X-Ray I.R.

  10. Mkn421

  11. Mkn421 – Contemporary observation with HESS • December 2004: flare observed by RXTE • Simultaneous observation with HESS on 18 Dec ‘04 allows - Cross calibration - Observation under different zenith angles => different energy ranges

  12. Signal of ~ 0.5 Crab 17.6 sigma 6h data Mkn501 Flux in time ??

  13. -ray detection from the GC -7 10 E2 dN/dE H.E.S.S. Chandra GC survey NASA/UMass/D.Wang et al. -8 10 15 TeV WIMP 6 TeV WIMP CANGAROO (80%) -9 10 from W.Hofmann, Heidelberg 2004 0,1 1 10 Whipple (95%) Energy [TeV] • detection of -rays from GC by Cangaroo, HESS • source < 3’ ( < 7 pc at GC) -> No information about the shape • hard E-2.21±0.09 spectrum fit to -annihilation continuum spectrum leads to: M > 12 TeV • other interpretations possible (probable) astro-ph/0408145

  14. Recent results push the mass towards 20 TeV; observations are taking place now

  15. HESS 1813 (5.6 s) 1ES 1959 (5 s)

  16. Osservazioni per 2005/06 Schedula approvata in aprile; grandi protagonisti: • AGN flaring (anche con osservazioni multiwavelength coordinate con i satelliti X e l’ottico) • GRB (il trigger con SWIFT funziona, MAGIC ha già ricevuto due trigger in un mese… purtroppo con cattive condizioni metereologiche) • Dark Matter • Centro Galattico • Orizzonte cosmologico e determinazione dei parametri cosmologici • SNRs e l’origine dei raggi cosmici • Sorgenti standard e ricerca di nuove sorgenti • Pulsar • … Sui temi 1. e 2. i team di analisi sono sostanzialmente italiani, con PI italiani; partecipazioni italiane importanti su 3., 4. e 5.

  17. Estensione a MAGIC II

  18. La costruzione del secondo telescopio MAGIC (in corso di approvazione INFN da 1 anno), renderà MAGIC II lo strumento più sensibile al mondo • Guadagno sulla sensibilita’ (fattore 2) • Guadagno sulla risoluzione (fattore 2) • Auspicabile il completamento entro fine 2006, per essere pronti a osservazioni simultanee con GLAST MAGIC II MAGIC I MAGIC II: sostanzialmente un clone di MAGIC I, con possibili miglioramenti • Meccanica semplificata (specchi da 1m2) – già in test su MAGIC I • Migliorata efficienza della camera (HPD o PM di nuova generazione) • FADC più veloci: migliora il rapporto segnale/rumore + dettagliata analisi temporale

  19. Time Schedule (as of Feb 05) • In 2005 • Telescope foundation is ready -- OK • Telescope structure is ready --OK • Camera construction starts (PMT modules) • Mirror production starts • AMC production starts • Final HPD optimization • In 2006 (VERITAS is ready) • Camera with PMT is ready • A half of mirrors and AMC are ready • HPD production starts • VCSEL production & ready • Receiver boards production & ready • FADC production & ready • Trigger Production & ready • Partial operation • In 2007 (GLAST is in operation) • Advanced Camera is ready • All mirrors are put in place • MAGIC-II is ready for full operation in the second quarter • In 2008 (HESS-II is ready) • The discussion on the next generation ultimate telescope system becomes serious

  20. Investimento stimato per il secondo telescopio: 5000 kEUR (7000 kEUR con HPD camera) Chiesti nei preventivi INFN 2005 e confermati: 1400 kEUR per costruzione apparati (~700 kEUR per superficie riflettente, ~700 nuovo DAQ e processing)

  21. MAGIC II e gli altri partner internazionali • Germania (~36%, 2.2 MEUR) • Approvato (1.5 MEUR da MPI gia’ disponibili) • Spagna (~24%,1.2 MEUR) • In attesa di risposta in questi giorni • Italia (~28%, 1.4 MEUR)

  22. Sommario e conclusioni • Il caso scientifico dell’astrofisica gamma con telescopi Cherenkov è chiaro • Stereoscopia (HESS←MAGIC) e bassa soglia (MAGIC←HESS) sono entrambi riconosciuti come caratteristiche importanti • MAGIC ha dimostrato di funzionare. Affinché l’Italia possa essere competitiva oltre un orizzonte di 3 anni, e’ necessario complementarlo quanto prima con un clone, MAGIC II • L’asta per le opere civili di MAGIC II è partita