1 / 8

VLBA Correlator Interfaces for VSOP-2

VLBA Correlator Interfaces for VSOP-2. Jon Romney NRAO, Socorro VSOP-2 Tracking Meeting Madrid / Yebes 2007/2/19-20. Essential Initial Digressions. The NSF Senior Review Panel convened by NSF Division of Astronomical Sciences. Report released 2006/11/3.

janetlucero
Download Presentation

VLBA Correlator Interfaces for VSOP-2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VLBA Correlator Interfacesfor VSOP-2 Jon Romney NRAO, Socorro VSOP-2 Tracking Meeting Madrid / Yebes 2007/2/19-20

  2. Essential Initial Digressions • The NSF Senior Review • Panel convened by NSF Division of Astronomical Sciences. • Report released 2006/11/3. • Primary goal: “redistributing roughly $30M of annual spending” from existing facilities, to invest in new facilities. • Primary recommendation on VLBA: “to seek assistance in operating the VLBA for a finite time from the international user community and, perhaps, also from NASA and the Japanese [ISAS] where there is a strong synergy with its missions.” VSOP-2 Tracking Meeting Madrid/Yebes

  3. The NSF Senior Review • NRAO Responses to SR Report • Concentrate on delivering high-profile science,in areas consistent with NSF Astronomy’s mission. • Seek non-NSF support for ~33% of $6M annual operational cost, at rate corresponding to ~$2k/hour. • Relevant options for VSOP-2: NASA and/or ISAS. • May require reducing scheduled observing time. • Upgrade VLBA’s sensitivityto expand range of science it can address. VSOP-2 Tracking Meeting Madrid/Yebes

  4. The VLBA Sensitivity Upgrade • 22-GHz Receivers • Replacement of LNAs. • 4-Gbps Data Path • Replacement of all equipment downstream from IFs. • New wideband Sampler/Filter module. • Compatible with VSOP-2 channelization. • New wideband Recording system. • Disk-based; compatible with existing Mark 5 module pool. • New Correlator. • WIDAR- or software-based. • Planned upgrades to existing playback interface abandoned. VSOP-2 Tracking Meeting Madrid/Yebes

  5. VLBA Correlator Interfaces • Discussed Here in Context of New Correlator • Existing correlator incompatible with VSOP-2 channelization; limited to 256 Mbps (for > 10 stations) without PBI upgrade. • Observation Data (Input) • 1- (2-,4-) Gbps data rate OK; subject to media pool constraints. • Recorded on Mark-5-standard disk modules. • Format TBD: Mark 5A, 5B, or (hopefully) more advanced wideband system. • Prompt delivery requirements same (probably even more stringent) as for VSOP -- i.e., “Bologna Rules”. VSOP-2 Tracking Meeting Madrid/Yebes

  6. VLBA Correlator Interfaces(Continued) • Orbit Data • Generally, same requirements as for VSOP. • Accuracy specifications TBD, possibly depending on correlator. • Format preferably same as JPL orbit kernels used for VSOP; could be changed for a different OD organization. • Logs • New correlator an opportunity to move to new log format. • Hope to develop new global standard. • Prompt delivery requirements same as for VSOP. VSOP-2 Tracking Meeting Madrid/Yebes

  7. VLBA Correlator Interfaces(Continued) • Time Correction Files • Presumably also required for VSOP-2. • No known reason to change VSOP format. • GPS Offset Files • Recommend merging into new Log format. • Visibility Output Data • TBD, as appropriate for post-correlation analysis system(s). VSOP-2 Tracking Meeting Madrid/Yebes

  8. Thank you VSOP-2 Tracking Meeting Madrid/Yebes

More Related