An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preparation for L2-5 silicon sensor arrival and L0/L1 PRR • desperately expecting the first 130 L2-L5 sensors from HPK in July - probably coming in two batches only • not yet arrived … Frank Lehner U Zurich Run IIb meeting 7/24/03

  2. Silicon sensor arrival - preparation • we have a detailed QA plan with established procedures • All people involved in that business should check on http://www.physik.unizh.ch/~lehnerf/dzero/qa/qa.html • QA document v4.0 • definition of tests • general procedures for testing • note that depletion voltage determination has changed and we adopt the HPK criterion • depletion voltage equals lowest voltage point where increase of 1/C2 versus bias is smaller than 2% • do not need interpolations - 10 V granularity is fine • Sensor QA part flow v2.0 • detailed part flow for testing • timing estimates • Procedures for sensor visual inspection v1.1 • Guidelines for clean room and sensor S&H v2.0

  3. Sensor arrival - preparation • testing sites have started to setup www accessible directories for excel spreadsheets • FNAL: http://d0server1.fnal.gov/users/lipton/www/asptest/sensor_test.html • KSU: http://www.phys.ksu.edu/hep/dzero/Testing • SB: http://sbhepnt.physics.sunysb.edu/silicon/ • UR: tbd • spreadsheets will be copied (raw) into database • only summary info on a special sheet will be transferred into ORACLE tables (via perl scripts) • spreadsheet templates exist on http://www.physik.unizh.ch/~lehnerf/dzero/db/db.html and http://www.phys.ksu.edu/~evt/D0database

  4. Sensor arrival - preparation • following spreadsheet exists now (see E.v.T. talk): • sensor_manufacturerinfo (for FNAL) • sensor_keytest (for FNAL L2-L5 and UR L0/L1) • sensor_fullstriptest (for SB, UR, KSU) • sensor_irradiation (for KSU) • sensor_mechanical (for FNAL, specific data format) • sensor_finalgrade (for Zurich, UR) • templates on http://www.physik.unizh.ch/~lehnerf/dzero/db/db.html and http://www.phys.ksu.edu/~evt/D0database • please use these formats: • use consistent units: pF, nA, MOhm, V, pA/V • charts are optional and up to the testing site • use consistent file naming containing sensor type and number, location, date and spreadsheet type • comment if necessary asap

  5. Sensor arrival - preparation • Key tests: • initial registration into DB (Nina R.) • checking paperwork/floppy disk from vendor for completeness • use of old-fashioned log book for sensor arrivals • checking if accompanying test structure has been shipped • inserting vendor info into “sensor_manufacturerinfo” spreadsheet • visual inspection (Nina R.) • visual inspection station in Lab A set up • I will train her the next days • follow visual inspection guidelines • use traveler form during inspection (form attached to visual inspection guide line) • insert main visual inspection comment into “sensor_manufacturerinfo” spreadsheet

  6. Visual Inspection Traveler • traveler is supposed to guide technician through the visual inspection steps • only major comments will be entered in sensor_manufacturer-info spreadsheet • estimate time for visual inspection: 20 minutes

  7. Sensor arrival - preparation • Key tests cont’d: • IV and CV for all sensors • FNAL: L2-L5 (Md. Mao, R. Lipton) • UR: L0, L1 (R. Demina, S. Korjenevski) • FNAL: 5% per batch I-stabil test for 24h • select sensors with suspicious I-V curves & flaws from visual inspection • enter data or work on program to transfer data into sensor_keytest spreadsheet

  8. Sensor arrival – preparation • 10% L2-L5 full strip test (FST) at KSU (35%) & SB (65%) • FST information goes into “fullstriptest” spreadsheet • summary sheet contains averages • for averaging leave out bad channels • charts in spreadsheet optional • initially 10% sensors per batch will be mechanically measured on OGP at FNAL • measure: thickness, flatness, cut tolerances 2x (sides and ends) • operator: Gordie G. – program on OGP ready • sensors which show chips/cracks at edges during visual inspection have to be measured • Jim provided mechanical data format containing target values and mech. grading

  9. Sensor arrival – preparation • irradiation test and IV & CV characterization at KSU • 1.5% of the sensors (irradiation on baby detector and/or test diodes) • two irradiation steps up to 2.5·E13 10 MeV p/cm2 • irradiate roughly half of the baby detectors which are at KSU anyway for FST tests • L0 & L1 baby detectors have to be shipped from UR to KSU for irradiation

  10. Sensor QA plan

  11. Sensor arrival – preparation issues • grading: • in the beginning done by FL/RD • filled in sensor_finalgrade spreadsheet • will wait with this to get a more complete picture of first batches • www access @ FNAL • have to setup a d0server1 www-directory for access to spreadsheets/data for manufacturer_info, key-tests and mechanical results: Ron’s www-directory ? • sensor storage @ FNAL • all incoming L2-L5 sensors will be stored during key tests in Lab A • dry boxes for sensor storage ordered • after the key tests the sensors, which will not leave FNAL, will be stored in Lab C • sensor shipping • read S&H guideline • do not ship more than 5 sensors per shipment

  12. L0/L1 PRR preparation • L0/L1 PRR will be on August 8th, 9 a.m. CT • documents & infos posted on http://www.physik.unizh.ch/~lehnerf/dzero/prr/prr_l1.html • following documents are prepared and are more or less finalized • Note on electrical characterization of L1 sensors • editors: Marcel & Frank • status: 2nd version exists • plots and results complete • waiting for feedback • should we include results from 3 new L1 sensors? • Note on irradiation of L1 sensors • editor: Frank • status: version 2.5 • plots and results complete • results on strip capacitance are a somewhat weaker point, went up from 1.1 pF/cm to almost 1.5 pF/cm • results on strip capacitance versus HV after irradiation thanks to Md. Mao

  13. L0/L1 PRR preparation • Note on comparison of strip measurements between SB and KSU • editor: Bob • status: 2nd version exists (from July) • gives a very nice overview, shows the overall good agreement between KSU and SB on many measurements with some exceptions though • wait for results on four sensor comparison • Note on fluence determination and dosimetry checks at KSU irradiation facility • editor: Tim • status: 2nd version exists (from July) • contains leakage current vs. fluence plots which are also in the other note • have different values for alpha (10 MeV p) due to different data sets • Tim: 7.9E-17 A/cm using L1-11/12, L2-59/62 • Frank: 11.6E-17 A/cm using L1-11/12, L2-59/62 and testdiodes • foil activation double check between FNAL & KSU within ~20%

  14. L0/L1 PRR preparation • older note on L2 irradiation document for L2-L5 PRR from March 6, 2003 • editor: Regina & Tim • status: updated by Tim last week • changed all relevant fluence numbers in plots from 1 MeV eq. n to 10 MeV p • alpha for 10 MeV for L2-59/62 is low: 6.8E-17 A/cm • other existing notes: • quality assurance document v4.0 -> will do some smaller typo corrections • visual inspection guidelines v1.1 • sensor S&H document v2.0 • generally in good shape …

  15. L0/L1 PRR preparation • all documents released to PRR committee by latest mid of next week • everybody, please read and send comments in to all notes • again, all notes are posted on: • http://www.physik.unizh.ch/~lehnerf/dzero/prr/prr_l1.html

  16. L0/L1 PRR preparation • first suggestions how to organize the PRR session (expect 3h in total): • 20+5’ talks on • general project overview • response to L2-L5 PRR findings/comments • presentation of general sensor QA program • sensor characterization of L1 sensors • probing comparison between FNAL/KSU/SB • irradiation results on L1 & test diodes • flux normalization cross checks • need video link to SLAC, UR, SB, KSU, Zurich