1 / 15

Storage Ring update

Storage Ring update. David Kelliher *, Chris Prior*, Jaroslaw Pasternak *^ (PRESENTING), Su Yan^ *STFC Rutherford Appleton Laboratory, ^Imperial College London 10/11/11 , Meeting at RAL, . Baseline lattice (25 GeV). Baseline lattice - Optics.

garima
Download Presentation

Storage Ring update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Storage Ring update David Kelliher*, Chris Prior*, Jaroslaw Pasternak*^ (PRESENTING), Su Yan^ *STFC Rutherford Appleton Laboratory, ^Imperial College London 10/11/11, Meeting at RAL,

  2. Baseline lattice (25 GeV)

  3. Baseline lattice - Optics Straight – High beta values to minimise beam divergence Matching – Includes bend to remove neutrinos from muons of high divergence Arc – Low beta value to minimise aperture

  4. Production straight magnets Clearance at QF near septum = aperture + magnet hardware (~20cm?) + beamsize

  5. Injection into the production straight • Long drifts, plenty of room for hardware • High beta function, low phase advance

  6. Injection into the production straight Kicked beam max excursion in QD is 26 cm – about 11 cm outside aperture Assume – 2cm separation at septum exit is sufficient.

  7. Injection into the production straight Kicked beam max excursion in QD reduced to 21 cm

  8. FFAG extraction kickers/septum Decay ring kicker rise time still needs to be decided. Magnetic field OK, aperture a bit larger. Interim Design Report

  9. Injection into insertion in arc (J. Pasterkak, Su Yan) • Can tune insertion to ease injection. Optics elsewhere unaffected • Injection hardware closer to surface • Remove arc cells to restore efficiency? + -

  10. Injection into insertion in arc (J. Pasterkak, Su Yan) QD1-D-QF1-D-QD2-D-QF1-D-QD1 Total extra length including dispersion suppressor = 83.2 m Reduction in efficiency to 35.5%

  11. Reducing the circumference (C. Prior) Previously with five bunches T= 2Tp, resulting in C~1608m

  12. Reducing the circumference (C. Prior) (???)

  13. LENF design (10 GeV) (J. Pasternak, Su Yan) • Racetrack design • Includes dispersion suppressor and insertion in arc for injection • Circumference 816 m. • 12 cells in production straight 20m, drifts 8m. • Beam divergence in production straight < 0.1/ as required • Efficiency  30% • 21m matching section, 4 arc cells (4.1 m each), 3 modified arc cells for dispersion suppression and insertion cell with 2.7m drifts are included.

  14. LENF design Optics (10 GeV) (J. Pasterkak, Su Yan)

  15. Summary • For the HENF, can inject into the production straight, but need to increase aperture of quadrupole between kicker and septum. • Alternatively could inject into an insertion in the arc with a 1.75% reduction in efficiency (scheme yet to be devised). • Kicker rise/fall time could be challenging with <500ns bunch separation. • Circumference of 25 GeV ring could be reduced given we now use 3 rather than 5 bunches but at the cost of including rf. • Low energy (10 GeV) design presented. Includes dispersion suppressor and insertion for injection.

More Related