1 / 7

All Experimenters’ Meeting

All Experimenters’ Meeting. September 23, 2013. Accelerator Operation Summary . From : September 16, 2013 (0000 hours) To: September 23, 2013 (0000 hours). Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons

fawzia
Download Presentation

All Experimenters’ Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. All Experimenters’ Meeting September 23, 2013

  2. Accelerator Operation Summary From : September 16, 2013 (0000 hours) To: September 23, 2013 (0000 hours) Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB Weekly Integrated Intensity 0.0 protons NMuonWeekly Integrated Intensity 0.0 protons MTest Weekly Integrated Intensity 4.17 E12 protons Beam Hours To NuMI 113.3 hours Beam Hours To MTest 72.9hours

  3. Status /Work Completed/Plans • Proton Source • Tuning & Studies • Maintenance during downtime • Replaced PA for LRF4 • Booster kickers • Main Injector • Accesses Tuesday (2 hr) & Thursday (day shift) • Ground fault in MI – Nothing found • 10 k Ω /ground Wednesday • 700k Ω /ground Thursday • Sump pump float and check valve • Beam to Switchyard & MTest • Tuning • Recycler Beam Studies • Alignment work • Investigated aperture restriction • NuMI • Runningand tuning • Switchyard • Worked on MSEP • Worked on extraction and beamline tuning • MTest • New experiments taking beam • NMuon • Alignment mapping – Horizontal Optical Scans • Installing magnets and connecting instrumentation

  4. Schedules and Links: • Schedule can be accessed from the Operations Home Page • - Schedules -> Operations Schedule • Direct link to schedule • - http://www-ad.fnal.gov/ops/schedule.html

  5. MI Ground Fault • Ground fault isolated to the buss penetration from the MI60 south power supply to the tunnel • Wednesday evening it was reading ~10KΩ/Ground • Thursday Morning it was reading ~ 700KΩ/Ground. With the remainder of the buss connected (MI60-MI50) the lower buss was reading ~500KΩ/Ground, not good but OK to run • Buss penetrations covers were removed for inspection Thursday but nothing was found

More Related