Comprehensive Guide to Summative Assignment: TDJ2O1 (Due January 10, 2014)
This document outlines the requirements for the TDJ2O1 Summative Assignment, which consists of a Planning Stage worth 40 marks and a Construction Stage worth 60 marks. Students must include research with sources, hand sketches, and a finished drawing with dimensions. A meeting with the instructor is mandatory before starting the project. Possible project ideas range from design and fabrication in wood or metal to kinetic sculptures. Students should think creatively, utilizing resources for inspiration and ensuring they manage their time effectively leading up to the submission date.
Download Presentation 
Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.During download, if you can't get a presentation, the file might be deleted by the publisher.
E N D
