SY120/MTest Beam Upgrades Rick Coleman AEM 10 March, 2008. Switchyard 120 Project. Switchyard 120 project. Phase I low intensity beams to Meson - Completed 2002 connection to Main Injector & 800 GeV SY replace cryo. left bends encl C with conventional magnets

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'SY120/MTest Beam Upgrades Rick Coleman AEM 10 March, 2008' - desma


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
switchyard 120 project1
Switchyard 120 project
  • Phase I low intensity beams to Meson- Completed 2002
  • connection to Main Injector & 800 GeV SY
  • replace cryo. left bends encl C with conventional magnets
  • Phase II clean transmission for High Intensity - Not Done
  • -add quads F2, F3 manholes
  • -move electrostatic septa from F1 encl. to M01 enclosure
  • -rework M01 3-way split
  • -rework (eliminate) “Meson Train” target box/collimators
slide5

MTest Beam Layout and Modes

Movable downstream 30cm target location

Movable upstream 25 cm Al target

Meson Test Beam Facility

Mtest secondary beamline

Proton Mode: 120 GeV protons transmitted through upstream target

Pion Mode: 8-66 GeV beam tuned for secondaries from upstream target

Low Energy Pion Mode: 1-32 GeV beam tuned for secondaries from downstream target

Feb 2007

f3 manhole quad installed
F3 Manhole Quad Installed

Special Thanks to:

AD/Mech(Mike Petkus, Chris Ader, Willie Stitts, Paul Gentry, Cliff Foster, John Featherstone, Bob Albrecht, Bob Slazyk), AD/EE(Julius Lentz, Bryan Falconer )

PPD/Alignment, PPD/Mechanical Installation

improvement with new f3 quads
Improvement with new F3 quads

Before

MT4/F1 ~40%

After

MT4/F1 ~80%

more spill options
More Spill Options

Currently operating with a 4 second long slow spill

once per minute (6 sec. total, 12 hours/day or 5%)

We have in the past changed from 4 sec to 1 sec,

but done manually it required a handful of experts

one or more shifts

  • 4 sec or 1 sec Slow spill length change automated-

Operations changes event type and few parameters

(Denton Morris, Dave Capista, Wally Kissel, Paul Allcorn, Peter Prieto,

Charlie Briegel, Chuck Brown)

  • “Pings” 2ms width slow resonant, ~5 pings per pulse
slide12

Changes to Main Injector QXR for Pings

Peter Prieto

  • Added an external 150V 15A Power supply for Pings.
  • Switch added in QXR Regulator so it can add Ping current on during spill.
  • Controls hardware added so Ping events ($33) through TCLK. Up to 8 events per spill.
  • MI-30 test that QXR can extracts beam with a 1 sec cycle and a 4 sec cycle and Pings can be generated during either one.

50 amps with

a 2ms duration

Need to test QXR driver software and then ready for beam test.

slide13

Backup Slides

MILESTONE: SWITCHYARD OPERATES REFRIGERATOR

L-R, R. Andrews, J. McCarthy, J. Appel discuss expansion engine operation

June 1978

slide16

MTest Detectors

TOF

PWC

Swic

Cerenkov

slide17

Rates* without lead scatterer

Rates* with lead scatterer

*Rates here are normalized to 1E11 at MW1SEM

**Measured at exit of facility with PbG calorimeter

many thanks to accelerator division for their efforts
Many thanks to Accelerator Division for their efforts

Peter Prieto in front of pulsing circuit for QXR

QXR quadrupole in Main Injector

Fast pulse performance in Tevatron - 1997