An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Airframe Measurements P09233 – Managerial Design Review

  2. Team Structure • Team Lead: Michael Skube – Mechanical Engineer • Co-Team Lead: James Hunt – Mechanical Engineer • Electrical Lead: Joseph Peters – Electrical Engineer • Kevin Li – Electrical Engineer • William Atkinson – Mechanical Engineer • Heidi Morgan – Electrical Engineer • John Isely– Mechanical Engineer

  3. Project Concept Development

  4. Airframe Measurement System

  5. Measurements Box Design GPS IMU Altimeter Microcontroller Ultrasonic

  6. Expenses To Date

  7. Bill of Materials

  8. Projected Project Costs • Building a second Measurements Box: • Total Project Cost: $1900(includes IMU cost ~$500) • Total Project Cost: $1400 (assumes donated IMU) • Measurements Box BOM: • $1100(includes IMU cost ~$500) • $600(assumes donated IMU) • The Current Project Cost: $910

  9. Current Risks • Ability to Program the MCU • Ability to Interface with the IMU • Ability to Test the IMU – MAV Test Stand • GPS Calibration • Airframe A Flight Testing

  10. Action Items • Program MCU • IMU Testing • Further Sensor Testing • Pitot Static Tube Mounting Design • Part Drawings • Assembly Instructions • Component Documentation

  11. Schedule - SDII Part Design Test Pitot Static Tube Program MCU Phase I System Testing Test Altimeter Document BOX Build

  12. Schedule - SDII Drawings Documentation Refine Programming Phase II System Testing Final Documentation Documentation