An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Response to EDR-04 Project updates ECAL electronics integration group T Lodge(RAL) deputy to W Lustermann. Common ECAL wide solutions. EE Planning Incorporated into overall ECAL planning. Justin Greenhalgh in regular contact with ECAL PM, TC and DTC. EE Tooling, mounting, assembly Person(s) to take responsibility for this work currently under discussion. EDR-06, 3 Sep 2002

  2. Response to EDR-04 • SC mechanics • Market survey launched with OJEC notice on 4 July 2002 • Deadline for questionnaire replies, Aug 19 2002 • Sorting of replies, requests for tender, Aug 22 2002 • Choose company(ies) end 2002 • 332 alveolar units completed by Myachichev • Sufficient for all of EE+ and 20% of EE- EDR-06, 3 Sep 2002

  3. Response to EDR-04 • VPTs • Pre-production, RIE: 500 delivered to RAL, Nov 2000. • Mass production contract, RIE, Oct 2001 for 15000 tubes. • Mass production: 1500 delivered • 1200 visually inspected and 1100 tested at 1.8T, RAL • Over 60 tested at 4T, Brunel • Full scale Endcap model • E0prime constructed at RAL, June-Oct, 2001 • Capacity for 4 cantilevered SCs • Accurate modelling of slice through Dee • Dee cooling, fibre optic & HV services plane, interim cooling plane, moderator, LV and power cooling plane, readout (50 channel units) plane, moderator+cooling HE side. EDR-06, 3 Sep 2002

  4. E0’ E0’ Up to 4 Standard SCs Umbilical noise and optimal layout studies Dee service and electronic integration issues EDR-06, 3 Sep 2002

  5. E0’ Accurate cross section through Dee All service planes incorporated 50 channel readout box incorporated To end 2002 - noise studies 2003 – proposal: incorporate new ECAL electronics, take to test beam EDR-06, 3 Sep 2002

  6. E0’ stages of build Fibre optic bundle, backplate & cooling, umbilical Interim cooling plane, HV, moderator, LV, power cooling plane EDR-06, 3 Sep 2002

  7. VPT data Yield (e/MeV), 1.8T (RAL) versus P*G at 0T (RIE) Yield (e/MeV), 1.8T (RAL) EDR-06, 3 Sep 2002