1 / 3

ARCHITECTURE DESIGN STUDIO 3 [ARC 2116]

ARCHITECTURE DESIGN STUDIO 3 [ARC 2116] Project 3 : GENIUS LOCI: VISITOR INTERPRETIVE CENTRE (VIC). My thinking about the site ( Pulau Jerejak ) - Pulau Jerejak had been famous for detention of leprosy patient and there is quite a few quarantine centre was built.

conlan
Download Presentation

ARCHITECTURE DESIGN STUDIO 3 [ARC 2116]

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ARCHITECTURE DESIGN STUDIO 3 [ARC 2116] Project 3: GENIUS LOCI: VISITOR INTERPRETIVE CENTRE (VIC) My thinking about the site (PulauJerejak) -PulauJerejak had been famous for detention of leprosy patient and there is quite a few quarantine centre was built. -People who step into this island must be fill with feeling of separation and hopeless. -People that staying in the PulauJerejak can always see their homeland (Pulau Penang or others) but they cannot reach there. -They are hoping someday they may walk through the darkness to the light source, guidance to the hope. -People inside the detention camp was used to the long corridor alongside with the opening of small cabin. -Inside the small spaces there is always an opening to let the only light source come into the cabin. Orthographic Drawings Site Context I had chosen a flat ground between the jetty and the quarantine centre. Activities carried out previously was quarry, transport and detaining leprosy patient. Ground Floor Plan Scale 1:200 First Floor Plan Scale 1:200 A B B Location Plan (PulauJerejak) NTS Roof Floor Plan Scale 1:200 A West elevation Scale 1:200 East elevation Scale 1:200 Section A-A Scale 1:200 South elevation Scale 1:200 North elevation Scale 1:200 Site Plan Scale 1:500 Section B-B Scale 1:200 Poetic Spaces Interior space: The slits of glass panel allow the light source to go through the wall into the spaces. The shadow and light effect will play on the VIC ‘s visitors as they walk through the long ramp. Public gathering space and cafeteria, expose to the environment outside, contrast compared to other spaces. A huge light source coming from the two end of the building giving people hope and guidance to walk through the building. • Design Strategy • Ramp – Convenient for old people (disabled) • Glass Block – Giving the full view around the site • Linear form – Smooth flowing of the experience inside the VIC • Glass slits – Penetration of light • Characteristics of My Design Model • Different feeling at different view port. • Feeling of little hope(light) in contrast with dark spaces within the model. • Alternate path instead of just one way trip. • 50 % exibition hall, 20 % public gathering space, 10 % cafeteria, 5% W/C,5% souvenir shop, 10% utilities. KhooChee Mei 0303125

  2. ARCHITECTURE DESIGN STUDIO 3 [ARC 2116] Project 3: GENIUS LOCI: VISITOR INTERPRETIVE CENTRE (VIC) Space orientation: Circulation: 11 2 1.Entrance 2.Reception 3. Exibition 4.W/C 5.Office 6.Souvenir shop 7. Cafeteria 8.Public gather 9. Viewing glass block 10.Store room 11.Kitchen Opening for rubbish disposal 7 To the WC, Public gather space , cafeteria. 4 5 8 4 3 6 10 To the exhibition hall, 1st floor From the 1st floor 8 1 9 9 To the souvenir shop, WC, store room and office. 3 3 3 Opening for staff only Private space Public space To the exhibition hall, ground floor Open and enclosed spaces: To the exhibition hall, cafeteria To the exhibition hall, viewing port To the exhibition hall, viewing port Path from entrance to exit Alternative path Open space Other opening Main open spaces was centred in the middle of the building. Semi enclosed space space Enclosed space Views Penang Bridge Jetty Quarantine Centre Roof Plan Quarry area Viewing Position • 2. View from cafeteria(ground floor) / exhibition hall (1st floor) • Relaxing view (ocean and mainland) • 3. View from the glass block and balcony • Feel how people come and leave from this deadly island • View from the glass block and balcony. • Feel the bitterness of leprosy patient. • View from the cafeteria (ground floor)/ exhibition hall (1st floor) • View of quarry stone (relaxing ) Photomontage of Design Model On Site Relationship Between Inside and Outside The extended open space, wall-less design at the centre of the buiding and open space view portwas designed for interacting the building with the environment (surrounding). KhooChee Mei 0303125

  3. ARCHITECTURE DESIGN STUDIO 3 [ARC 2116] Project 3: GENIUS LOCI: VISITOR INTERPRETIVE CENTRE (VIC) Precedent Study Slits house by Eastern Design Office The light came in from the thin slits between walls.  Strasbourg Cathedral by  Jacques-Francois Blondel The light that comes in from the clerestory window and rose window create shadow on the path. Glass House by Ludwig Mies van derRohe Fully glass furnished buiding provide better view. Integration of Design : ( BSC Project) SITE ANALYSIS Critical date and time: Sun path –Critical side (East) 21st June 9am Northern sun path Sun path –Critical side (west) 22nd December 9am Sorthern sun path Location : PulauJerejak, Pulau Pinang Latitude : 5.331580 Longitude : 100.317793 Altitude : 4metres Building Operation hours : 8am – 6pm VENTILATION Prevailing wind ( South-West) 9 6 Spaces organisation : 1.Entrance 2.Reception 3. Exibition 4.W/C 5.Office 6.Souvenir shop 7. Cafeteria 8.Public gather 9. Viewing glass block 5 3 4 3 7 4 8 3 1 2 9 Wind come from North-East (wing walls) 3 First Floor Plan Ground Floor Plan ZONING B PASSIVE COOLING DESIGN Green Roof BASIC BUILDING DESIGN A A  Green roof, or rooftop garden, is a vegetative layer grown on a rooftop. Green roofs provide shade and remove heat from the air through evapotranspiration, reducing temperatures of the roof surface and the surrounding air.Itmaximise radiant cooling. Mechanical Ventilation Natural Ventilated B Ground Floor Plan First Floor Roof Plan SUN PATH Section B-B Interior ventilation through openings (entrance and exit) to the 1st floor ( open space). Section A-A 21st March 9am 12pm 5pm MECHANICAL COOLING Interior ventilation interior spaces .An ideal mechanical cooling is the circulation of air within the would provide air to occupants at a comfortable temperature and humidity. Critical date and time: The heat gain calculation is based on this critical time shown below. 212t June 9am 12pm 5pm Sun path –Critical side (East) 21st June 9am Northern sun path Note : vegetation at the west façade is represented by a wall. 22 December 9am 12pm 5pm OOTV = 36253.4 / 800 =45.31675 W/m2 KhooChee Mei 0303125

More Related