1 / 6

APEX

APEX. Fulvia Pilat. Time Meeting, April 10 2007. APEX Schedule April 4 2007. Ramps >70 bunches > 1x10 9 ppb Button BPM Trans. monitor IPM. Store 12 bunches 0.5-1x10 9 ppb BBQ. Injection 3 bunches 0.5-1x10 9 ppb AC dipole. Store 6 bunches 0.5-1x10 9 ppb NO rebucketing

chad
Download Presentation

APEX

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. APEX Fulvia Pilat Time Meeting, April 10 2007

  2. APEX Schedule April 4 2007 Ramps >70 bunches > 1x109ppb Button BPM Trans. monitor IPM Store 12 bunches 0.5-1x109ppb BBQ Injection 3 bunches 0.5-1x109ppb AC dipole Store 6 bunches 0.5-1x109ppb NO rebucketing BBQ Store >12 bunches 0.5-1x109ppb In collision BBQ 07-07 Beam beam compensators Fischer+team 07-06 Nonlinear Chromaticity Luo Tepikian +team 07-29 Beam-Beam TF for lumi Cameron, Drees 07-08 Beta Beat Calaga 07-22 Transition Instability Ptitsyn, Wei +team Back 2 Phys 07-16 Debunched Beam Rev freq Fischer+team 5am 7am 9am 11am 1pm 4pm 5pm

  3. Summary April 4th Most of APEX time went into recovering from quench links and diagnosing a broken ramp (from swaps of blue and yellow current regulator cards done the night before) • APEX starts at 5 am, work at injection gets done • QLI, 7:37am b2-q89 • QLI, 8:10am bo11-qd3 • QLI, 8:29am bo11-qd3 • QLI, 12:22pm b2-q89 14:21pm b2-q89 replaced • QLI, 14:34pm b4-dhx • 15:40pm finally ramp, blue80%, yellow 13% • Nonlinear chromaticity correction in blue operational • 15:40pm end of “APEX”

  4. Beta beat measurements - Calaga First attempt at correction did not work  we’ll try again tonight

  5. Nonlinear chromaticity correctionBLUE OPERATIONAL Luo, Tepikian

More Related