1 / 24

BIDDERS’ CONFERENCE IT-3981

BIDDERS’ CONFERENCE IT-3981. Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity. Technical Annexes 1 and 4. Technical Annexes 1 and 4. Annex 1: General Requirements for Electrical Overhead and Gantry Cranes

Download Presentation

BIDDERS’ CONFERENCE IT-3981

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity Technical Annexes 1 and 4 Handling Engineering Group

  2. Technical Annexes 1 and 4 Handling Engineering Group Annex 1: General Requirements for Electrical Overhead and Gantry Cranes Annex 4: PLC Programming and Documentation Requirements

  3. Annex 1 Handling Engineering Group General requirements applicable both to new cranes and to new components for refurbishment works on existing cranes Some of the requirements are mandatory while others are applicable only when stated in the technical questionnaire Machine Directive 2006/42/EC and technical questionnaire have priority with respect to this document

  4. Annex 1 Handling Engineering Group

  5. Annex 1 Handling Engineering Group

  6. Annex 1 Handling Engineering Group

  7. Annex 1 Handling Engineering Group

  8. Annex 1 Handling Engineering Group

  9. Annex 1 Handling Engineering Group

  10. Annex 1 Handling Engineering Group

  11. Annex 1 Handling Engineering Group

  12. Annex 1 Handling Engineering Group

  13. Annex 1 Handling Engineering Group

  14. Annex 1 Handling Engineering Group

  15. Annex 1 Handling Engineering Group

  16. Annex 1 Handling Engineering Group

  17. Annex 4 Handling Engineering Group Covers the following aspects of PLC programming: Design requirements Interface withusers Software protection Documentation

  18. Annex 4 Handling Engineering Group

  19. Annex 4 Handling Engineering Group

  20. Annex 4 Handling Engineering Group

  21. Annex 4 Handling Engineering Group

  22. Annex 4 Handling Engineering Group

More Related