SlideServe
Menu
Preferences
© SlideServe · v2026

E. Coli Testing in Meat and Poultry Processing Plants

carrington avatar
12 slides · 382 Views · Mar 07, 2014

Critical information on E. coli testing requirements for various meat species including cattle, swine, sheep, goats, and poultry. It outlines the regulatory requirements such as the necessity of a written plan, sample collection and analysis, and record-keeping protocols aligned with FSIS guidelines. The document emphasizes the roles of slaughter plant personnel in carrying out tests, adhering to sampling schedules, and maintaining compliance to prevent noncompliance issues. A checklist approach to enforce FSIS responsibilities and maintain inspection integrity is also highlighted.

E. Coli Testing in Meat and Poultry Processing Plants - slide 1
01 / 12E. Coli Testing in Meat and Poultry Processing Plants
1 / 17

Download Presentation

E. Coli Testing in Meat and Poultry Processing Plants
An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

More Related Content

Presentation Transcript
  1. E. Coli Testing An Overview M. A. “Peachie” Cline Burlin, D.V.M.

  2. RegulatoryRequirements • Written plan • Collect and analyze samples • Records

  3. Species Tested - Meat • Cattle • Swine • Sheep • Goats • Horses • Mules • Other Equines

  4. Species Tested - Poultry • Chickens • Turkeys • Ducks • Geese • Guineas

  5. Who Tests? • PLANT PERSONNEL IN SLAUGHTER PLANTS

  6. How? • According to written plan • FSIS guidelines • FSIS video • AOAC test

  7. Record Keeping • m/M values • Statistical process control • 13 test moving window • Maintain 12 months

  8. FSIS Responsibilities • Basic Checklist • Other Checklist • Enforcement

  9. Basic Checklist • When? • Special team 1/97 • Grant of inspection Basic Checklist 1. Written plan 2. Sampling 3. Records

  10. Other Checklist • PBIS schedules Other Checklist 1. Correct species 2. Location 3. Frequency 4. Random selection 5. AOAC Method 6. Last 13 tests 7. CFU/ml or square cm 8. 12 months of records 9. m/M value 10. SPC

  11. Enforcement • Withhold inspection • Basic noncompliance • Repetitive other noncompliance • Shipping contaminated product • Noncompliance Record • Individual other noncompliance

  12. The End