Carl Johan WALLNERSTRÖM and Patrik HILBER, KTH – Royal Institute of Technology – Sweden

Implementation and evaluation of commonly used risk analysis methods applied to a regional power distribution system. Carl Johan WALLNERSTRÖM and Patrik HILBER, KTH – Royal Institute of Technology – Sweden Julio GADEA TRAVI, Gotlands Energi / Vattenfall – Sweden. Background.

carl
Download Presentation

Carl Johan WALLNERSTRÖM and Patrik HILBER, KTH – Royal Institute of Technology – Sweden

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Implementation and evaluation of commonly used risk analysis methods applied to a regional power distribution system Carl Johan WALLNERSTRÖM and Patrik HILBER, KTH – Royal Institute of Technology – Sweden Julio GADEA TRAVI, GotlandsEnergi/Vattenfall – Sweden

  2. Background • Mandatory risk and vulnerability analysis • Regarding reliability, including an action plan • Annually reported by DSOs, first time in 2011 • Additional incentives: • Quality regulation (0.05-12 hour outages) • Laws regarding >12/>24 hours outages Wallnerström C. J., Hilber, GadeaTravi J. – Sweden– Session 5 – PaperID 0567

  3. Studied system • Gotland is the largest island in Baltic Sea • A lot of wind power, HVDC link to mainland • Owned by Gotland Energy / Vattenfall AB • Concerns regarding that existing risk management not suit all specific conditions Wallnerström C. J., Hilber, GadeaTravi J. – Sweden– Session 5 – PaperID 0567

  4. The aims of this paper • Describe and evaluate the first year and find suitable methods for the future • The results can hopefully be useful, both by companies that will perform risk analyses and by method developers • University and DSO knowledge exchange Wallnerström C. J., Hilber, GadeaTravi J. – Sweden– Session 5 – PaperID 0567

  5. Paper contents • Description of current situation in Sweden • Summary of commonly used risk analysis methods used by DSOs • Description and evaluation of former risk management performed by this DSO • Proposal of future methods to use Wallnerström C. J., Hilber, GadeaTravi J. – Sweden– Session 5 – PaperID 0567

  6. Risk management performed • Power lines: a risk method develop by Swedish Electrical Utilities’ R & D Company (Elforsk AB) • Risk value (0.05-400) based on three parameters: Exposure (probability), Load (consequence) and Endurance (reliability) Wallnerström C. J., Hilber, GadeaTravi J. – Sweden– Session 5 – PaperID 0567

  7. Risk management performed • Substations: risk matrix (1-16) method based on authority recommendations • Risk value (RV) 1-4 (green): acceptable • RV 6-8 (orange): consider risk reduction • RV 9-16( red): risk reduction must be implemented in a near future Wallnerström C. J., Hilber, GadeaTravi J. – Sweden– Session 5 – PaperID 0567

  8. Risk management evaluation • 10 kV: used method seems proper • Two parts of performed risk analyses were identified to have concerns • 70/30 kV lines: Score tables were not adjusted to few but large load points • Substations: A lot of attention to details Wallnerström C. J., Hilber, GadeaTravi J. – Sweden– Session 5 – PaperID 0567

  9. Proposed modified 30/70 kV • Evaluation: Proposed method are more suited for 70/30 kV lines Wallnerström C. J., Hilber, GadeaTravi J. – Sweden– Session 5 – PaperID 0567

  10. Proposed modified substations • Risk matrix, similar as for power lines • Reduction in the number of details • Only orange/red risk are reported: • Orange  input to a “maintenance matrix” • Red always  mandatory to the action plan • Accurate enough, can save a lot of work. Wallnerström C. J., Hilber, GadeaTravi J. – Sweden– Session 5 – PaperID 0567

  11. Concluding remarks • Risk analyses by a DSO were evalu-ated, which indicated two concerns • Existing methods were adjusted and these modified methods were then evaluated with satisfactory results • The results can hopefully be useful both by DSOs method developers Wallnerström C. J., Hilber, GadeaTravi J. – Sweden– Session 5 – PaperID 0567