presented by joe deem opda system support branch manager april 12 2007 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Presented By: Joe Deem, OPDA/System Support Branch Manager April 12, 2007 PowerPoint Presentation
Download Presentation
Presented By: Joe Deem, OPDA/System Support Branch Manager April 12, 2007

Loading in 2 Seconds...

play fullscreen
1 / 11

Presented By: Joe Deem, OPDA/System Support Branch Manager April 12, 2007 - PowerPoint PPT Presentation


  • 120 Views
  • Uploaded on

2007 Federal Investments and Borrowings Seminar. GAISS System. Consolidation. Presented By: Joe Deem, OPDA/System Support Branch Manager April 12, 2007. Government Agency Investment Services System: Prior to 1999. Government Agency Investment Services System: Summer 2005.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Presented By: Joe Deem, OPDA/System Support Branch Manager April 12, 2007' - birch


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
presented by joe deem opda system support branch manager april 12 2007

2007 Federal Investments and Borrowings Seminar

GAISS System

Consolidation

Presented By:

Joe Deem, OPDA/System Support

Branch Manager

April 12, 2007

gaiss high level timeline
GAISS High Level Timeline

Calendar Year

2007

2008

Q1

Q2

Q3

Q4

Q1

Q2

Phase Description

Phase I Meet with BPD and define high level requirements.

Phase IIa Detailed requirements & functional design for custom components

Phase IIb Build and test custom components

Phase III Configure Solution and Perform Integration and User Testing for each program

Phase IV Implement Distributed Architecture and support for each program

Checkpoint – provide a more accurate build estimate for the InvestOne Enterprise custom components and re-plan the implementation

how am i affected
How Am I Affected???
  • Federal Agency Investors
    • New login and authentication procedures
    • Modification to Transaction Input Interfaces
    • Centralized Contact Management
    • Enhanced Reporting Capability
      • Reporting Toolkit
      • Dynamic Reports
      • Potential for Ad-Hoc Reporting
  • Federal Agency Borrowers
    • Account Balance Verification
    • Dynamic Reporting Capability
slide10
Name __________________________________

Phone # ________________________________

Agency _________________________________

Email ___________________________________

Suggestion ______________________________________________________________

______________________________________________________________

__________________________________________________________

______________________________________________________________

______________________________________________________________

______________________________________________________________

______________________________________________________________

______________________________________________________________

______________________________________________________________

______________________________________________________________

______________________________________________________________

______________________________________________________________

______________________________________________________________