Download
water conservation areas floor deviation investigation april 2007 n.
Skip this Video
Loading SlideShow in 5 Seconds..
Water Conservation Areas Floor Deviation Investigation April 2007 PowerPoint Presentation
Download Presentation
Water Conservation Areas Floor Deviation Investigation April 2007

Water Conservation Areas Floor Deviation Investigation April 2007

127 Views Download Presentation
Download Presentation

Water Conservation Areas Floor Deviation Investigation April 2007

- - - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

  1. Attachment 3 Water Conservation AreasFloor Deviation InvestigationApril 2007 HESM Department April 9, 2007

  2. WCA Floor Deviations • Purpose: Impact/Benefits from lowering WCA Floor Elevations for April – October 2007 • Analysis performed using SFWMM in Position Analysis mode • Base Case (Alt 0): April 07 Position Analysis with no additional demand management for LEC Service Areas • Deviations: Base with lowered floor elevations in all 3 WCAs

  3. WCA FLOOR ELEVATION ALTERNATIVES (feet, NGVD) All alternatives propose a sloping floor elevation to provide a gradual transition from the baseline floor elevations to the specified floor elevations.

  4. Lake Okeechobee

  5. WCA-1

  6. Canal CA-1

  7. Gage 1-7

  8. Gage 1-8T

  9. Gage 1-9

  10. WCA-2A

  11. Canal L38

  12. Gage 2-17

  13. WCA-3A