1 / 1

Evolution and Integration Command Center

Evolution and Integration Command Center. Enable “go/no-go” decision for re-configuration tasks Monitor “live” evolution of system as you would monitor network. “monitor average server HTTP response time as the new database back-end engine is brought on-line”.

Download Presentation

Evolution and Integration Command Center

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Evolution and Integration Command Center • Enable “go/no-go” decision forre-configuration tasks • Monitor “live” evolution of systemas you would monitor network “monitor average server HTTP response time as the new database back-end engine is brought on-line” Insert probes basedon Architectural Model Generate gauges Goal A2 C22 E3 • Rapid hypothesis testing • FlexML event description • Generate verification gauges • Dynamic probing of componentsand connectors L9 D1 high Method Expected … e1 e2 e3 e4 e5 e6 e7 e8 e9 … “Does replacementcomponent L9 usemore disk resourcesthan its predecessor?” low Event Stream • FlexML Event Representation • Standard lexical syntax • Partially ordered streams rather than fixed-length documents • Composed/interleaved tag sets rather than rigid DTD • Supports dynamic composition of sophisticated processors • Gauges as active connectors • Gaugents as feedback controllers • Architectural Models showhow to develop testing regimentfor verifying that componentsbehave as expected duringdynamic system evolution,integration, and re-configuration Technical Basis WPI

More Related