An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DIF DIF DIF DIF Detector Unit Detector Unit Detector Unit Detector Unit Storage Overview of DAQ system Detector Unit: ASICs DIF: Detector InterFace connects generic DAQ and services LDA: Link/Data Aggregator fansout/in 8–10 DIFs and drives links to ODR ODR: Off-Detector Receiver is PC interface CCC: Clock and Control Card fans out to ODRs (or LDAs) Control PC: Using DOOCS DAQ PC ODR LDA Control PC (DOOCS) CCC LDA DAQ PC ODR

  2. Overall DAQ system status • Individual component hardware and firmware exists at various stages of readiness : • ECAL DIF : prototype successful; production in progress; firmware being developed. • CCC : Custom board; hardware production done; firmware being developed; to be used by SPIDER collaboration? • LDA : Commercial board with add-on HDMI and Ethernet links; firmware advanced. • ODR : Commercial high performant I/O board; firmware and software done; integrated in DAQ PC with RAID array. • Working on integrating components (at UCL) : • Links (Gbit ethernet) between the LDA and ODR. • Links (synchronous, serial link with additional asynchronous pairs) between the DIF and LDA. • Generating data and sending across with some success. • Getting all components to the same stage of readiness. • Progress on use of DOOCS as DAQ software : advanced for controlling ODR; other components to proceed as their status becomes more final.

  3. Summary and issues • Within EUDET, to deliver working DAQ system by June 2009. • DAQ system for ECAL, AHCAL and DHCAL. • Doing link/system tests : debugging and improving. • No show-stoppers yet and on track for June 2009. • We have no STFC funding after 31 March 2009 and will live off EUDET money : • Have funds for all hardware procurement. • Have a busy few months integrating system with itself and the detectors. • To lead to a successful implementation of modern standards-based DAQ system with associated publication and technical notes. • Will then have to reduce effort drastically and have very little mandate for future effort. • UK DAQ lead position in ILC will be lost.