An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chamonix outcome – LIU-SPS B.Goddard

  2. From HL-LHC and LIU • Little ‘wiggle-room’ for HL-LHC in the parameter space • Lower emittance generally good, except IBS... • 25 ns preferred but 50 ns has to be kept as serious alternative • LIU cannot meet HL-LHC targets in baseline (after LS2) • All upgrades need to bring required benefit • Need stretched performance goals – losses/emittance preservation, PS space charge limit, SPS space charge limit, SP longitudinal stability. Assumed after LS3 - LIU++?

  3. HL-LHC Parameter Space: 25ns en [mm rad] Aperture variation example beam life time e-cloud limit for d = 1.2 single bunch TMCI 0 1 2 3 IBS ≈ 15h virtual performance reach head-on beam-beam without R head-on beam-beam with R 0 1 2 3 Nbunch [1011] Oliver Brüning BE-ABP Chamonix, 9 February 2012 3

  4. HL-LHC Parameter Space: 50ns en [mm rad] Aperture variation example virtual performance reach single bunch TMCI 0 1 2 3 IBS ≈ 15h head-on beam-beam without R head-on beam-beam with R 0 1 2 3 Nbunch [1011] Oliver Brüning BE-ABP Chamonix, 9 February 2012 4

  5. Planning and project baseline • Planning for aC coating to maintain as baseline • Do we need to review LS2 plans soon? Logistics, WS, ... • Need serious plan for LS2 and restart afterwards • Duration and interdependencies of LS2 work to define in detail • Beam commissioning of the 3 machines - staggered?

  6. Some thoughts for SPS • ZS sparking limitations – priorities and plans for 2012 MDs • Differential pumping at TIDVG – MKP: plans? • Longer bunches to LHC – 2012 studies? Could be crucial and should be pushed • Extra extraction kickers possible in some of neutrino scenarios – impedance? • Where are we with overall impedance estimates?

  7. Other reactions?