An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. GERENCIA ESTRATÉGICA DE COSTOS UN ENFOQUE MODERNO

    2. GESTIÓN DE COSTOS

    5. PROPUESTA COSTEO BASADO EN ACTIVIDADES: ABC (Activity Based Costing). ADMINISTRACIÓN BASADA EN ACTIVIDADES: ABM (Activity Based Management) .

    8. Por qué actividades? Si fabricar un producto o prestar un servicio es costoso, es porque las actividades que se desarrollan son costosas; y son costosas porque no se usa la tecnología precisa, porque el recurso humano no tiene el perfil que se requiere, o porque consume muchos recursos. Si se quiere reducir el costo es necesario intervenir las actividades.

    13. FASES PARA LA CONSTRUCCIÓN DEL MODELO ABC Conocimiento general de la Universidad. Sensibilización y capacitación del personal. Determinación de los objetos de costo. Análisis de los sistemas de información. Determinación de los procesos, subprocesos y actividades. Determinación de los recursos.

    14. Construcción del modelo de costos. Determinación de direccionadores a todo nivel. Implantación del sistema computarizado. Cálculo de los costos unitarios de los objetos de costos. Análisis de costos y rentabilidad. FASES PARA LA CONSTRUCCIÓN DEL MODELO ABC

    15. POR QUÉ LOS COSTOS?