1 / 20

Chapter 3

Chapter 3. Resolution and Design. Predesign Phase. Programming Functions to: Guide Inform Inspire the project designer Not a ‘grocery list’ Not a ‘wish list’ Owner and Architect break a project down: Room-by-room Space-by-space Department-by-department Relationship-by-relationship.

alyson
Download Presentation

Chapter 3

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter 3 Resolution and Design

  2. Predesign Phase • Programming • Functions to: • Guide • Inform • Inspire the project designer • Not a ‘grocery list’ • Not a ‘wish list’ • Owner and Architect break a project down: • Room-by-room • Space-by-space • Department-by-department • Relationship-by-relationship

  3. The Project Program • A function of the owner, guided by the architect to meet the following needs: • Provides information about desires and the general concepts of the project – answers the architect’s questions. • Provides all information required by the architect to design the project • Life-style • Features • Design style • Specific parameters • Discuss budget and contingency funding • Discuss possibility and method for changes

  4. The Program • The sequence of programming and design events involves the following: • Strategic goals and objectives • Legal and regulatory parameters • Building functions and unique activities • Space requirements for each room and associated adjacencies • Specific requirements for each room • Specific requirements for each building services (mechanical) systems • Site constraints and development requirements • Design and planning considerations • Concept solution • Project budget • Project schedule and delivery constraints

  5. Design Phase • Project Design • Balloon Diagram • Show routings • Relationships between operations • Departments and personnel • Combine the above into some shape or form of enclosure • Enclosure then designed to be • Pleasing • Attractive • Functional • Virtual design is more widely used today • Design is founded on: • Function, strength, aesthetics and economics

  6. Design Phase • Project Design (continued) • Design is a process that is directed toward resolving four general areas in every project: • Needs and desires of people • Physical, intellectual, aesthetic and emotional • Influences of architecture • Natural, cultural, and technological • Major requirements of architecture • Function, strength, aesthetics and economics • Design elements of architecture • Plans, forms and composition

  7. Design Phase • Project Design (continued) • Design can be seen as following scientific processing, in that it closely follows ths six steps established by Galileo for scientific exploration: • Define the problem • Establish objectives • Collect pertinent information • Analyze the problem • Consider possible solutions • Solve the problem • Steps 1-4 are called ‘programming’ • Steps 5-6 are called ‘design’

  8. Design Phase • Development of a Schematic (Preliminary) Design • Project Designer formulates an overall design scheme • Examine factors that may affect design scheme • Incorporate more programming information as manifested by meetings • Develop schemes (most often numerous) and work with owner on final design • Revisions, Changes and Additions • Tearing apart and starting again if viable solutions are not attained • Reach a consensus solution • Variations of the basic solution

  9. Design Phase • Revisions, Changes and Additions (continued) • A CM could be hired to: • Be an agent of the owner • Lend insight on the schematic design process in the form of: • Construction practices • Materials • Systems • Cost information • A GC could be hired much like a CM and provide construction data in the design process.

  10. Design Phase • Revisions, Changes and Additions (continued) • In the end the owner: • Makes the subjective decisions of which design scheme or concept is preferable • The professionals usually • Aid the selection process • Discuss pros and cons of each plan w/ the owner • Create, plan and develop options • Take comments and instructions from the owner • Revise to adjust the scheme to the new criteria.

  11. Design Approval (By Owner) • Approval of Design Concept: • Professional may present several concepts to the owner for evaluations which contain: • Elements of the project • Associated cost • The structure: • May change in appearance according to concepts • Options are usually necessary • The owner should choose the configuration with the best fit for all of the project program parameters. • The owner makes the final decision on which concept will be used. • Formally approved by owner in writing (signed drawings) • Renderings and floor plans are now developed

  12. Design Approval (By Owner) • Renderings and floor plans are now developed • These drawings control other aspects of the project • Provide basis for: • Drawings • Documents • Concepts • What if the plans do not work? • Project could be in jeopardy • May not achieve a good final result • Floor plans give overall extent and configuration • Renderings provide the exterior appearance

  13. Interior Hand Rendering

  14. Exterior Hand Renderings

  15. Sketch-Up Rendering

  16. Revit Rendering

  17. Design Approval (By Owner) • Final Approval of Design Concept • Approval must be documented: • In writing • Signed drawings • Could guide specifications listing • Materials and systems • How the project will be constructed • How the contract will be fulfilled • Lacks minute details but sets: • Directions • Requirements • Intent of the professional • Marks the formal end of the schematic design

  18. Design Approval (By Owner) • Subsurface Investigation • I contradicted myself here in last lecture – in the architects ‘perfect world’ anything can be built anywhere given enough money. • May be part of the feasibility study: • Think of the proposed site location • If the soil is tried-and-true to expected performance there is no guess work. • Could be a deal breaker • Subsurface soils investigation is an essential part of the design of the project: • Types of soil may determine expense of bearing systems • Never ignore the soils condition it is an essential part of the design process

  19. Design Approval (By Owner) • Subsurface Investigation • Common method of investigation: • Soil boring: • driving a hollow tube, about 2.5” in diameter, and composed of two halves. • Also called ‘split-spoon sampling’ • Driven to a depth pre-established by local geology mapping. • When opened the sample shows: • Depth • Composition • Coloration of the various soils • Expressed in pounds or tons/square foot • What is the best bearing material?

  20. Design Development Phase • Design Development • Second portion of the design phase • Brings detailed information to the documents • Involves selection of: • Materials • Systems • The gathering and piecing together of data that shows exactly the construction to come • The drawings can be used and often seen as the actual contract (working drawings) • This phase takes time, usually 20% of the total fee • CAD has helped in cutting this fee • Read paragraph 2 page 81

More Related