aaralyn
Uploaded by
27 SLIDES
513 VIEWS
270LIKES

Transit-Oriented Development (TOD) Housing Program

DESCRIPTION

Transit-Oriented Development (TOD) Housing Program. California Department of Housing and Community Development. Program Purpose. To stimulate development of higher density housing, including affordable rental and ownership opportunities within close proximity to transit

1 / 27

Download Presentation

Transit-Oriented Development (TOD) Housing Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Transit-Oriented Development (TOD) Housing Program California Department of Housing and Community Development

  2. Program Purpose • To stimulate development of higher density housing, including affordable rental and ownership opportunities within close proximity to transit • Facilitate connectivity between housing and transit • Encourage increased public transit use and reduction of automobile trips

  3. Eligible Uses • Loans for housing developments • Grants to localities to provide loans for first time homebuyers • Grants for infrastructure that • is necessary for development of qualifying housing; or • facilitates connections between the qualified housing and transit station • Loans for Redevelopment Agencies to acquire land

  4. Notice of Funding Availability (NOFA) • Released January 30, 2009 • $95 million • Application Deadline is April 2, 2009 • Funding awards to be made in June

  5. Geographic Distribution Objectives • Awarding not less than • 45% of Funds to Southern California • 30% of Funds to Northern California • 40% of Funds to Projects served by Qualifying Transit Stations not Served by Heavy Rail

  6. Assistance Terms and Limits • Maximum program loan or grant combination for a single Housing Development, or single housing developer, shall be $17 million per NOFA • Total maximum amount of Program assistance for applications based on a single Qualifying Transit Station shall be $50 million over the life of the program

  7. Key Eligibility Requirements • Housing Developments must be at least 50 units • Housing Development must be located in a qualifying urbanized area as defined by the U.S. Census • Qualifying urbanized areas must have recurrent congestion

  8. Key Eligibility Requirements • Housing Developments must be located within one quarter mile of a transit station • Housing Developments must be located within one half mile of a transit station along a walkable route

  9. Key Eligibility Requirements • At least 15% of the total housing units must be affordable to persons of low or very low income households • Projects must meet density standards based on location

  10. Residential Density Requirements • Large City Downtown 60 units acre, 3.0 FAR • Urban Center 40 units acre, 2.0 FAR • All other areas 25 units acre, 1.5 FAR

  11. Key Threshold Requirements • Construction project has not commenced • Project infeasible without Program Funds • Applicant must meet minimum point total of 250 points (maximum available is 380) • Applicant must have site control

  12. Site Control • Documentation Methods • Deed • Lease • Option to Purchase • Land Sales contract • Disposition and Development Agreement • Agreement with Public Agency giving sponsor exclusive rights to negotiate with that agency for acquisition of the site

  13. Project Timeline • Construction of the Housing Development must • commence within Three Years of the Program Award, and • be completed within Five Years of the Program Award Date

  14. Project Specific Detail

  15. Eligible Projects and Applicants • Rental Housing ► Eligible Developer • Homeownership ► Eligible Developer and Locality • Infrastructure ► Locality or Public Transit Agency • Land Acquisition ► Redevelopment Agencies Only

  16. Rental Housing Specifics • The Base Loan Amount Shall be • $20,000 more per unit than those Established for the August 18, 2008 Multi-family Housing Program (MHP) NOFA, or • $17,000,000, whichever is less

  17. Homeownership Housing Specifics • Grant to be subject to the Provisions set forth in the Building Equity and Growth In Neighborhoods (BEGIN) Program Guidelines as Amended April 9, 2008

  18. Infrastructure Grant Specifics • For Housing Infrastructure, the Grant Amount Shall be Limited to • $35,000 per Un-Restricted Unit • $50,000 per Restricted Unit • For Transportation Infrastructure, the Grant Amount Shall be Limited to $10,000 per unit

  19. Infrastructure Grant Requirements • Infrastructure improvements that support Housing Developments or enhance transportation accessibility must be connected to a Housing Development • Infrastructure grants must be matched by a cash contribution of funds equal to 20% of the Infrastructure Project grant. Contribution may include federal or state funds under local control

  20. Infrastructure Grant Requirements • Project Timeline • Sources and Uses Chart Note : If Housing Development includes multiple phases, all entitlements and funding commitments for the first phase must be received

  21. Infrastructure Grant Requirements • Grant shall be repaid to the Department if all necessary and discretionary public land use approvals have not been received for the Housing Development within five years of the date of the program award.

  22. Eligible Infrastructure Activities • In support of housing development • Water Upgrades • Sewer Upgrades • Streets • Drainage Basins • Utility Access • Parking Spaces or Structures when Required by a Public Agency as a Condition of Development

  23. Eligible Infrastructure Activities • In support of transportation access • Pedestrian Walkways • Plazas • Mini-Parks • Signal Lights • Streetscape Improvements • Security Enhancements • Bicycle Lanes and/or Parking • Intelligent Transportation Information Systems

  24. Eligible Infrastructure Costs • Environmental Studies, remediation and mitigation • Real Property Acquisition costs and fees Excludes real estate commissions for purchase or acquisition • Engineering Design and Supervision • Relocation Costs • Construction work, fees and costs

  25. Land Acquisition Specifics • Loan Available to RDA’s only • Loan Amount shall not exceed the lesser of • 80% of the Appraised Value of the Land to be Acquired, or • $50,000 per Residential Unit in the Proposed Development, or • $3,000,000

  26. Application Process

  27. TOD Staff • Craig Morrow, TOD Program Manager CMorrow@HCD.CA.Gov • Conant Radcliffe, TOD Rep CRadcliff@HCD.CA.Gov • Brian Johnston, TOD Rep BJohnston@HCD.CA.Gov • John Lemert, TOD Rep JLemert@HCD.CA.Gov