Results of Münster-Meeting

Results of Münster-Meeting. 4 flanges on roof instead of 12 ( two 2 DN250, 2 DN100) Stiffeners can be placed on the roof Also variabel in amount and / or placement Rails have to be built on the roof for safe access to the flanges Top disk is flanged to roof

zahina
Download Presentation

Results of Münster-Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Resultsof Münster-Meeting 4 flanges on roofinsteadof 12 (two 2 DN250, 2 DN100) Stiffenerscanbeplacedontheroof Also variabel in amountand/orplacement Railshavetobebuilt on theroofforsafeaccesstotheflanges Top diskisflangedtoroof Diameter of top disk will bechangedto 2.75m; tokeepheighttheslopeofroof will beincreased Cryo-pipe isleadthrough wall ofwater-tank by a flange

  2. Status Water-tank before Münster-meeting

  3. More activities • TPC • Cryofor TPC • Outervessel • Accessories • Gassystem • Check Layout • Check alreadyboughtvalves • List oftobeorderedparts (MFC, etc.) • Place in lab? Accessories.