CAMINADA HEADLAND BEACH / DUNE RESTORATION Governor’s Advisory Commission on Coastal Protection, Restoration and Conservation Meeting October 5, 2011. Outline. Project Overview Fill Template Options Conveyance Corridor Options Project Schedule. PROJECT GOALS.

wind
Download Presentation

Outline

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CAMINADA HEADLAND BEACH / DUNE RESTORATION Governor’s Advisory Commission on Coastal Protection, Restoration and Conservation Meeting October 5, 2011

  2. Outline • Project Overview • Fill Template Options • Conveyance Corridor Options • Project Schedule

  3. PROJECT GOALS Address severe erosion of Headland (historical rate average of 45 ft per year) Protect and sustain unique coastal habitats, Chenier Ridges, essential for migratory birds Reduce wave energy & saltwater intrusion into back barrier environments Provide sediment source to sustain barrier breaches east and west of the Headland

  4. PROJECT LOCATION MAP

  5. CAMINADA HEADLAND BBBS RECOMMENDED PLAN

  6. CAMINADA HEADLAND Footprint Options 1-3

  7. CAMINADA HEADLAND TYPICAL DESIGN TEMPLATES BEACH ONLY

  8. CAMINADA HEADLAND TYPICAL DESIGN TEMPLATES BEACH AND DUNE

  9. CONCEPTUAL CONVEYANCE CORRIDORS

  10. CONCEPTUAL BELLE PASS PUMP-OUT AREA

  11. CONCEPTUAL PASS FOURCHON PUMP-OUT AREA

  12. CONCEPTUAL OFFSHORE RE-HANDLING / PUMP-OUT AREA

  13. DESIGN SCHEDULE • Data Collection May 2011 – October 2011 • Preliminary Design May 2011 – December 2011 • Permitting September 2011 – April 2012 • Final Design January 2012– April 2012

  14. Questions?