1 / 13

WIND GENERATION IN ROMANIA

WIND GENERATION IN ROMANIA. BLACK SEA REGIONAL TRANSMISSION SYSTEM PLANNING PROJECT WORKING GROUP MEETING – June 15-16, 2010, Kyiv. dr. Dan Preotescu – Transelectrica. dr. Dan Preotescu – June 15 th , 2010, Kyiv. Yearly Consumption [TWh]. dr. Dan Preotescu – June 15 th , 2010, Kyiv.

viet
Download Presentation

WIND GENERATION IN ROMANIA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WIND GENERATION IN ROMANIA BLACK SEA REGIONAL TRANSMISSION SYSTEM PLANNING PROJECT WORKING GROUP MEETING – June 15-16, 2010, Kyiv dr. Dan Preotescu – Transelectrica

  2. dr. Dan Preotescu – June 15th, 2010, Kyiv Yearly Consumption [TWh]

  3. dr. Dan Preotescu – June 15th, 2010, Kyiv Long term targets for Romanian PS • According to the Law 220 / 2008 the generation on renewable sources (subject of green certificates support scheme) should cover the following quantities per year: • 2009 – 6,28 % – ~3,20 TWh; • 2013 – 9,00 % – ~4,95 TWh; • 2017 – 13,20 % – ~8,05 TWh; • 2020 – 16,80 % – ~10,92 TWh. • Values are not including the generation of the “big” HPP.

  4. dr. Dan Preotescu – June 15th, 2010, Kyiv Present status of generation based on renewable sources, in operation • Wind ~ 14 MW • Small Hydro ~ 70 MW • Photovoltaic 0 MW • Biomass ~ 8 MW Total ~ 92 MW

  5. dr. Dan Preotescu – June 15th, 2010, Kyiv Present status of wind generation* • Wind farms in operation till the end of the year: ~ 400 MW • Wind farms with access to the grid contract signed: ~ 3000 MW • Wind farms with technical permit granted: ~ 3000 MW Total projects in advanced stages: ~6000 MW Projects in different stages: >15.000 MW 400 MW * Presently the most significant renewable source in Romania

  6. MOLDOVA Area BANAT Area DOBROGEA Area dr. Dan Preotescu – June 15th, 2010, Kyiv

  7. dr. Dan Preotescu – June 15th, 2010, Kyiv Wind generation in Romania – significant aspects • Forecasts for installed power: 2015 – 3000 MW; 2020 – 5000 MW • Financial support scheme : Green certificates (2/MW for wind and 6/MW for solar with a margin of 27÷55 euro/certificate). • Technical requirements for Wind generators are presently on the way to be included in the Technical Grid Code. • Testing program for wind generators will also be included in the Technical Grid Code.

  8. dr. Dan Preotescu – June 15th, 2010, Kyiv dr. Dan Preotescu – June 15th, 2010, Kyiv Potential and limitations I – Power System • Presently the Romanian PS can manage without any restrictions around 800 MW ÷ 1000 MW wind generation (respectively around 3000 MW ÷ 4000 MW installed power). • Improvement of the regulation framework (especially regarding the congestion management) can make room for more capacity without investments. • Improvement of the wind forecast. • Pump Storage HPP’s: Olt river (~400 MW) and Tarnita or other locations (1000 MW). • Modern gas and/or coal fired generation units.

  9. dr. Dan Preotescu – June 15th, 2010, Kyiv Potential and limitations II – Transmission Grid • The capacity of the transmission grid is usually a regional and in some cases local problem. • Transmission grid is the physical support of the electricity market therefore the investments are usually useful for all significant market actors. • Development plans of Transelectrica allows significant increase in generation, both “classical” and renewable as well. • Investment volume for the next 5 ÷ 7 years can not be covered by the present transmission tariff.

  10. Dr. Dan Preotescu – October 19th, 2009, Bucharest

  11. dr. Dan Preotescu – June 15th, 2010, Kyiv Potential and limitations III – Electricity Market • Wind generation has in principle priority but in practice this priority is not clearly defined. • The market rules for wind generation are limiting the commercial potential to the mandatory quotas. • The export is not yet allowed. • Creation of intra-day market will increase the transaction volumes

  12. dr. Dan Preotescu – June 15th, 2010, Kyiv Potential and limitations IV – Legislation • New laws are designed to support the industry but fail to do so efficiently because they are not focused on the really important aspects. • Charging the Grid Operators with 50% from the access to the grid costs will reduce a little bit the investment but will cause large delays in project duration because the shortage of funds. • Lack of legislation for land acquisition should be a major concern for the future developments.

  13. dr. Dan Preotescu – June 15th, 2010, Kyiv Thank you for your attention !