1 / 25

Northeast Corridor - Overview

Northeast Corridor - Overview. Regional Plan Association Spring 2010. Rail: A Vital Economic Stimulant. Northeast Megaregion has a $2.4 Trillion Economy , 20% of the Nation’s GDP Central business districts , and research and development clusters around universities ,

tyrell
Download Presentation

Northeast Corridor - Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Northeast Corridor - Overview Regional Plan Association Spring 2010

  2. Rail: A Vital Economic Stimulant Northeast Megaregion has a $2.4 Trillion Economy, 20% of the Nation’s GDP Central business districts, and research and development clusters around universities, are the engines of the economy in the Northeast Future economic growth depends on the ability tomove goods and people quickly and reliably between the region’s urban centers.

  3. Congestion Relief Airports are nearing capacity, made worse by the growth in short haul air travel within the megaregion. Over 20 percent of all flights out of the three New York City Area airports are less than 350 miles Three Quarters of nation wide delays in the aviation systems originate in the New York metro region Rail/Air Market Share Average Daily Departures (2008) NY - DC NY - BOS 63% 37% 49% 51%

  4. Linked Economies

  5. HSGTA Brief History of NEC NY-DC Goal NY-DC Actual NY-BOS Goal NY-BOS Actual Deadline Event 5hrs 4hrs 4:00 3hrs 2hrs 1965 1969 1971 1976 1981 1982 1986 1991 2010

  6. TurboTrain HSGTA MetroLiner Brief History of NEC NY-DC Goal NY-DC Actual NY-BOS Goal NY-BOS Actual Deadline Event 5hrs 4hrs 4:00 3hrs 3:00 2hrs 1965 1969 1971 1976 1981 1982 1986 1991 2010

  7. TurboTrain MetroLiner HSGTA Amtrak Brief History of NEC NY-DC Goal NY-DC Actual NY-BOS Goal NY-BOS Actual Deadline Event 5hrs 4hrs 4:00 3hrs 3:00 2:45 2hrs 2:00 1965 1969 1971 1976 1981 1982 1986 1991 2010

  8. TurboTrain Amtrak MetroLiner HSGTA NECIP Brief History of NEC NY-DC Goal NY-DC Actual NY-BOS Goal NY-BOS Actual Deadline Event 5hrs 4hrs 4:00 3:40 3hrs 3:00 2:45 2:40 2hrs 2:00 1981 1965 1969 1971 1976 1981 1982 1986 1991 2010

  9. TurboTrain Amtrak MetroLiner HSGTA NECIP Brief History of NEC NY-DC Goal NY-DC Actual NY-BOS Goal NY-BOS Actual Deadline Event 5hrs 4hrs 4:00 3:40 3:40 3hrs 3:00 2:45 2:40 2:40 2hrs 2:00 1981 1985 1965 1969 1971 1976 1981 1982 1986 1991 2010

  10. TurboTrain NECIP MetroLiner Amtrak HSGTA Brief History of NEC NY-DC Goal NY-DC Actual NY-BOS Goal NY-BOS Actual Deadline Event 5hrs 4:24 4hrs 4:00 3:40 3:40 3hrs 3:00 3:00 2:45 2:40 2:40 2hrs 2:00 1981 1985 1965 1969 1971 1976 1981 1982 1986 1991 2010

  11. TurboTrain Amtrak MetroLiner NECIP HSGTA Brief History of NEC NY-DC Goal NY-DC Actual NY-BOS Goal NY-BOS Actual Deadline Event 5hrs 4:24 4hrs 4:00 3:57 3:40 3:40 3hrs 3:00 3:00 2:45 2:40 2:40 2:36 2hrs 2:00 1981 1985 1965 1969 1971 1976 1981 1982 1986 1991 2010

  12. 1999 TurboTrain MetroLiner Amtrak NECIP HSGTA NEHRIP Brief History of NEC NY-DC Goal NY-DC Actual NY-BOS Goal NY-BOS Actual Deadline Event 5hrs 4:30 4:24 4hrs 4:00 3:57 3:40 3:40 3hrs 3:00 3:00 3:00 2:45 2:40 2:40 2:36 2hrs 2:00 1981 1985 1965 1969 1971 1976 1981 1982 1986 1991 2010

  13. 1999 TurboTrain NERIP NECIP MetroLiner HSGTA Amtrak Brief History of NEC NY-DC Goal NY-DC Actual NY-BOS Goal NY-BOS Actual Deadline Event 5hrs 4:30 4:24 4hrs 4:00 3:57 3:40 3:40 3:30 3hrs 3:00 3:00 3:00 3:00 2:50 2:45 2:40 2:40 2:36 2hrs 2:15 2:00 1981 1985 1965 1969 1971 1976 1981 1982 1986 1991 2010

  14. Federal Investment in NEC NECIP* NHRIP** *NECIP – Northeast Corridor Improvement Program **NHRIP – Northeast Corridor High Speed Rail Improvement Program

  15. Current Rail Times and Speed From New York – Penn Station

  16. Ownership of NEC

  17. Commuter Operations on NEC Amtrak predicts ridership on the NEC to double by 2030 for 13M to 26M Over that same time period total volume on the corridor is expected to increase from 250M to 400M

  18. Train Movements by Segment

  19. Capacity Constraints on the NEC Source: The Northeast Corridor Infrastructure Master Plan, October 2009

  20. Capacity Constraints on the NEC Source: The Northeast Corridor Infrastructure Master Plan, October 2009

  21. What Needs to be Done - SOGR State of Good Repair Backlog ~ $8B More than 200 bridges most dating to the turn of the last century Baltimore’s B&P Tunnels dating to post-Civil War period Many interlockings (junctions and crossovers) which have not undergone a major renewal in decades and are now functionally obsolete Electric traction systems straining to cope with increased traffic levels while relying on 1930’s-era components

  22. What Needs to be Done -Growth Source: The Northeast Corridor Infrastructure Master Plan, October 2009

  23. What Needs to be Done - Growth NEC Infrastructure Capital Needs, 2010-2030 ($ Millions) Cost Category Total (M$’s) Growth 32,319 SGR Backlog 7,944 Amtrak owned 4,744 Connecticut owned 3,200 Subtotal 40,263 Normalized Replacement Amtrak owned 7,211 Connecticut owned 1,000 New York owned 924 CSXT owned N/A Subtotal 9,135 Total $49,398 Source: The Northeast Corridor Infrastructure Master Plan, October 2009

  24. Trip Times with Improvements From New York – Penn Station

  25. www.America2050.org www.rpa.org

More Related