Northeast Corridor Greenway Acquisition

Northeast Corridor Greenway Acquisition. City Council Workshop November 12, 2013. Presentation Outline. Background: Northeast Corridor Projects Action Plan Project Location Project Benefits Current Proposal: Consultant Selection Process Feasibility Study Project Objective Next Steps:.

viveka
Download Presentation

Northeast Corridor Greenway Acquisition

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Northeast Corridor Greenway Acquisition City Council Workshop November 12, 2013

  2. Presentation Outline Background: • Northeast Corridor Projects Action Plan • Project Location • Project Benefits Current Proposal: • Consultant Selection Process • Feasibility Study • Project Objective Next Steps:

  3. Northeast Corridor

  4. Northeast Palm Coast CorridorGreenway Acquisition • Unique Value of Lands • Lands are in unique position between Flagler County conservation easement lands and SJRWMD lands providing opportunity for creating wetland mitigation credits for city transportation projects. • City control of Special Flood Hazard Area (SFHA) - Critical component in the National Flood Insurance Program (NFIP) and the City’s community rating. Project Site

  5. Northeast Palm Coast CorridorGreenway Acquisition • 42 acres of unpermitted wetland impacts currently out of compliance. Restoration plan accepted by SJRWMD. • South Tract: 159.64 ac. • Wetlands: 95.55 ac. (60%) total area • 14.17 ac. impacted • Uplands: 64.09 ac. (40%) total area • Floodplain Comp: 8.317 ac. Upland • North Tract: 128.69 ac. • Wetlands: 73.00 ac. (57%) total area • 25.83 ac. impacted • Uplands: 55.69 ac. (43%) total area • Wetland impacts will require restoration/alternative permitting SJRWMD Lands OKR Extension Flagler County Lands

  6. Northeast Palm Coast CorridorGreenway Acquisition Benefits • Primary Benefits of Land Purchases • Cost Savings & Timing – Ability to avoid eminent domain proceedings. Ability to keep projects moving forward with the Interchange project schedule. • Floodplain Compensation – Land necessary for completion of Northeast Corridor projects. • City control of Special Flood Hazard Area (SFHA) - Critical component in the National Flood Insurance Program (NFIP) and the City’s community rating that directly affects flood insurance rates. • Potential Additional Benefits of Land Purchase • Wetland Mitigation – Potential to create mitigation credits for use of transportation and other city projects in lieu of purchasing mitigation credits from a wetland mitigation bank. • Recreational Uses - Investigate passive recreational uses of the site to expand connectivity to other lands to expand public uses.  • Water Quality - Benefits water quality in the Pellicer Creek Basin • Habitat - Expands the existing regional conservation corridor and ecological significance due to the unique linkage to conservation areas to the north and south.

  7. Northeast Corridor Greenway Acquisition(NCGA) • Consultant Selection Process: • Letter of Interest (LOI) Released - Three firms contracted for Environmental and Engineering Services (RFP-CM-08-05) were invited to the selection process. All firms are highly qualified in conducting wetland assessments, mitigation planning and designing, and listed species assessments. • Jones Edmunds & Associates • Stantec • Atkins • Project Objective – Produce a feasibility study to guide the City on project costs and timing of design, permitting, monitoring and overall management of the NCGA with a cost-benefit analysis in-mind. • Cost of Services - $35,278.00

  8. Northeast Corridor Greenway Acquisition(NCGA) • Next Steps: • Feasibility Study completion date is targeted for April 2014. • Provide City Council a presentation of study findings. • If findings are favorable, design and permitting services will be secured. Target completion date for permitting is July 2015.