An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Detector DAQ Issues Jean-Sebastien Graulich, Geneva • Achievements Since CM25 • DAQ System Upgrade • Luminosity Monitors • Sequels of the CAMAC crate incident • Event Building • Schedule Milestones • Summary Jean-Sebastien Graulich

  2. Achievements since CM24 • DAQ system upgrade is ready • Luminosity monitors integrated • Trigger system cabling optimized • DAQ and Trigger System Consolidation • Cabling documentation in progress • Progress in EMR front-end electronics Jean-Sebastien Graulich

  3. DAQ System Upgrade • Upgrade was needed for • Standard Operating System on all Online PC • Stable Software Behaviour • Controlled Installation/Replacement Procedure • User Friendly • DATE Software update • Better Memory management allowing larger buffers -> Increase the number of events per spill • Delicate operation • No service interruption allowed • Need rapid back up procedure in case of problem • Detailed documentation mandatory Jean-Sebastien Graulich

  4. DAQ System Upgrade • Plan of action • Backup a disk image of the working PCs • Develop the upgrade procedure on a mirror system • Develop scripts for automatic OS and Software installation • Test the DAQ on the mirror system • Apply the installation procedure to the working PCs • Status • New system tested successfully • Detailed installation documentation available • Waiting for the next shutdown for the final migration Jean-Sebastien Graulich

  5. DAQ System Consolidation • A common Online software repository has been Set-up (James Leaver) • Using Bazaar • All the DAQ software is now securely backed up and properly versioned • The online monitoring code will follow soon • A stable Installation procedure for DATE and DAQ code is now available and documented • Strong basis for coming development • Tracker DAQ !!! Jean-Sebastien Graulich

  6. Luminosity Monitor Counters • 3 LMC Signals recorded in the VME scaler • 1-2 Coincidence • 3-4 Coincidence • 1-2-3-4 coincidence • Required a reorganization of the Trigger NIM electronics • No time is recorded ! • Also shown on the TV monitor(new channel mapping) Soler’s Signals ECL Conversion before VME Scaler Jean-Sebastien Graulich

  7. The CAMAC Crate Incident • The Incident • In December 2009, after TOF2 installation, the power supply for the CAMAC crate holding TOF Discriminator failed (over current) • The diagnostic of the failure was not simple • After unsuccessful replacement of thePower supply and the fan tray, it wasdecided to replace the full crate => Re-cabling of all the boards ! Jean-Sebastien Graulich

  8. The CAMAC Crate Incident • The Consequence • Half of the ECL cables re-plugged in reverse polarity • Christmas Run cancelled • The Sequels • All boards and cables properly labeled • New cables prepared to avoid single pair connections • A new CAMAC board has been designed and produced to simplify the layout and reduce the current • Detailed layout and cabling drawing under way Jean-Sebastien Graulich

  9. New CAMAC module • Function • Distribute the Part. Trigger and the Part. Trg. Request signal to all the TDCs (Synchronization reference) • Was • A combination of • NIM Fan out • NIM to ECL converter • Issue • Messy cabling • Current consumption • Will be • A single CAMAC board made in UNIGE • After shutdown (will modify timing -> Calibration) Jean-Sebastien Graulich

  10. Event Building • The synchronization problem between the two crates persists • We incriminate the PCI/VME interface • It couldn’t be replaced because • all the spares used for the mirror DAQ system • Massive failure of boards: 4 out of 10 boards had to be send for repair • In the meanwhile • Online monitoring histogram allow to spot the problem • A VME and PC power cycle solve it temporarily • Shifter’s attention is required Jean-Sebastien Graulich

  11. Schedule Milestones • From CM25 • CAM data in Online Data Stream Nov 09 -> Mai 10 • Tracker integrated in DAQ and OLM Jan 10 -> July 10 • TOF TDC Clock Synchronization March 10 -> Aug 10 • More complicated than first thought. Need a dedicated board • Burst Gate Signal in the Trigger System Need support here ------------------------------------- The priority has been set to the DAQ and Trigger system upgrade and consolidation • DAQ System upgrade Mai 10 • Production of SW/EMR Front End Electronics Jan 10 -> Started Jean-Sebastien Graulich

  12. Summary • DAQ System upgrade ready • Migration scheduled for the next shutdown • Luminosity monitor Counters integrated into the DAQ • Significant effort in consolidation and documentation • Next steps • Interface with CAM • Tracker readout Jean-Sebastien Graulich