Detector DAQ Integration

Detector DAQ Integration. Jean-Sebastien Graulich, Geneva. Status Expected delivery date Required support & infrastructure Initial test plan. Hardware Status. Trigger logic: 2 Lecroy 4516 in hand (1 + 1 spare will be rented) Trigger Receiver in hand (7 boards)

nedaa
Download Presentation

Detector DAQ Integration

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Detector DAQ Integration Jean-Sebastien Graulich, Geneva • Status • Expected delivery date • Required support & infrastructure • Initial test plan Jean-Sébastien Graulich

  2. Hardware Status Trigger logic: 2 Lecroy 4516 in hand (1 + 1 spare will be rented) Trigger Receiver in hand (7 boards) Trigger Scalers ordered (2 in June) NIM and Camac Crates and PS 2 brand new VME crates in hand 2 new VME crates ordered (June) 3 second hand VME crate in Hand 2 expected from Fermilab 6 VME-Pci Interfaces in hand 4 LDC PCs in hand 2 GDC about to be ordered 2 Switches about to be ordered Jean-Sébastien Graulich

  3. Software Status • DATE software installed and running on 2 PCs • Interface related software is ready • TDC V1290 readout running (optimization needed) • To be done • VLSB readout • Flash ADC readout • Trigger receiver interface and readout Trigger receiver board will also do trigger condition selection • Progressing “slowly but continuously” • No reason to believe it won’t be ready in time… Jean-Sébastien Graulich

  4. Expected delivery • Vassil and me at RAL on July 15-28 • We’ll send the PCs and Crates one week before • 4 VME crates, 6 LDC PCs, 2 GDCs, 1 runControl PC, 1 Data Saver PC • If no surprise, DAQ software can be operational in 48 hours. • Probably instable at the beginning… • There is always some need for hardware/software debugging • No estimation: We’ll do our best Jean-Sébastien Graulich

  5. Required support & infrastructure • We assume • LCR Accessible, main power plugs, Air conditioning, Ethernet connection • Room for PCs: • 8 standard PC towers (40 x  20 x 45 cm3) • 3 maxi-towers (70 x 20 x 45 cm3) • 4 workstations: standard PC tower + monitor and working space • Some particle trigger signal • Support for cabling • Network Cabling inside the LCR • DAQ to/from Tracker • DAQ to/from Target System • DAQ to RF System area • External signals: • Machine Start • Dp train • Isis beam monitor or Isis discriminated RF • Target ready signal (the target system should receive its trigger from us) • Questions • Shall we send our racks ? • Can RAL provide power cords with UK jacks ? • Is there any kind of electronics pool at RAL ? Jean-Sébastien Graulich