Detector DAQ Status

Detector DAQ Status. Jean-Sebastien Graulich, Geneva. Since CM16 Detector DAQ software Front End Electronics Schedule Milestones Summary. Since CM16. DAQ Software Training in CERN-ALICE group Completed We have been officially granted the right to use DATE

leroy
Download Presentation

Detector DAQ Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Detector DAQ Status Jean-Sebastien Graulich, Geneva • Since CM16 • Detector DAQ software • Front End Electronics • Schedule Milestones • Summary Jean-Sébastien Graulich

  2. Since CM16 • DAQ Software Training in CERN-ALICE group Completed • We have been officially granted the right to use DATE • Test of Front End Electronics for TOF and EMCal • Decision to use CAEN V1724, 100 MHz, 14 bit flash ADC • Successful tests of the Shaper/Amplifier coupled to the flash ADC • Decision to use Lecroy 4415A Discriminators available in Geneva for TOF in Phase 1. • Start working on a technical design for the Particle Trigger Jean-Sébastien Graulich

  3. DATE Vocabulary • LDC : Local Data Concentrator • The PC connected to the VME crate via the PC-VME Interface • GDC : Global Data Collector • Event Builder • Event • DATE Event = DAQ Event !!! It contains data for several Particle Events (~600) • Trigger Receiver • Input Register (with several inputs) receiving the signal informing the LDCs that something has happened, e.g the spill is finished and the data should be readout (= DAQ Trigger) • Event Type • Tag attached to the event depending on which trigger receiver‘s input has been used. Jean-Sébastien Graulich

  4. DATE Readout Process • Two processes running in each LDC • The readout process waits for a trigger, reads out the front-end electronics, and fills a FIFO buffer with the sub-event data • The recorder process off-loads the FIFO and sends the sub-event data to one (or several) GDC over the network • Each LDC contains a set of Equipments • Equipment =~ 1 Vme board (in MICE) • Each equipment has its own set of routines for its initialization and readout. • Adding an equipment is done without recompiling all DATE • Equipment configuration data is saved in MYSQL database (but not archived) Jean-Sébastien Graulich

  5. DATE Readout Algorithm • General algorithm for equipment readout: 5 user routines have to be implemented (XXX is the name of the equipment) • ArmHwXXX • Executed at the beginning of the Run • Allows initialization of the board • AsynchReadXXX • Executed constantly even when there is no trigger • Don’t use ! • EventArrivedXXX • Used only if the equipment needs to trigger the readout ( Trigger Receiver) • ReadEventXXX • That is the readout itself • DisArmHwXXX • Executed at the end of the Run Jean-Sébastien Graulich

  6. DATE Data Format • The data sent by the equipment is just wrapped with a LDC header (+ a GDC header if used) • The data format in the payload is defined by the manufacturer of the equipment ! (we will stick to 32 bits words) • DATE Header format defined in a header file event.h This file contains all the information the offline codes needs to know about DATE Data from the equipment -> Jean-Sébastien Graulich

  7. FEE Tests with cosmics • Testing the CAEN V1724, 14 bits, 100 MHz Flash ADC Test similar to the one presented at CM16 for the SIS3320 Improvement: each PMT now connected to a TDC a QDC and a FADC TDC Shaper QDC Discr. FADC Trigger Counter FADC Shaper QDC Discr. TDC Test done with TOF Scintillator bar and EMCal Pmts EMCal Twisted pair Cable => new shaper prototype Jean-Sébastien Graulich

  8. Shaper Output Need for better tuning of baseline restorer Used for individual baseline evaluation Time (sample) The signal shape is still very well understood Jean-Sébastien Graulich

  9. Charge and Time from FADC • The amplitude of the shaped signal is proportional to the original charge • Very simple algorithm => Save CPU for offline analysis • Comparing MAX with INTEGRAL allows simple detection of pile up • In case of pile up => Need more sophisticate algorithm Voltage (adc ch) Max ~ Q 30% Max 25 30 35 40 45 50 T_th Time (sample) Jean-Sébastien Graulich

  10. Charge Resolution Double peak caused by 50 Hz structured noise on the base line (observed on the scope, also on the QDC line) Jean-Sébastien Graulich

  11. Charge Resolution • Very good linearity • The few points off the line are • Out of QDC gate signal • Noise in the line • Pile up (rare) • Intrinsic Resolution of FADC = 1.8 QDC channels equivalent • Better than the QDC itself = 2.4 QDC channels Jean-Sébastien Graulich

  12. Time Resolution • Looking at the Time difference between Left and Right Pmts • TDC is sensitive to Time Walk (and to the track angle) => Applying cuts on charge deposit in both PMTs makes the tail disappear Jean-Sébastien Graulich

  13. Time Correlation 4 cm wide trigger counter Sigma = 490 ps Time Difference in FADC (ns) Sigma = 455 ps Slope = 1 Time Difference in TDC (ns) • Resolution for time measurement in FADC : 210 ps Starting from 10 ns Sampling Period ! Assuming 100 ps resolution for the TDC measurement (including residual time walk) Jean-Sébastien Graulich

  14. Linearity • Trigger counter moved by + and - 10 cm • Peak shift: TDC not linear / FADC linear • Refraction Index: TDCn = 2.2 / FADCn = 1.41 • Sigma: Not constant / Constant • Time difference in TDC is sensitive to Time Walk • Moving the trigger detector changes the relative amplitudes in Left and Right PMTs Jean-Sébastien Graulich

  15. Shaper design See Roumen’s talk • 2 stages vs 4 stages Same Charge resolution: The 4 stages has more noise But also more gain • Output is more symmetrical with 4 stages • Components can be adjusted to reduce the full width while keeping the rise time > 4 samples • The aim is to keep the width <= 450 ps so that we can record 10 samples before the signal (for the baseline measurement) and miss only one beam burst • It allows reducing the occupancy time => Reducing the level of segmentation in SW (less channels -> less $) Jean-Sébastien Graulich

  16. PID FEE for Stage 1 • Summary Jean-Sébastien Graulich

  17. FEE for Stage 1 • We have already 10 LS 4415A in hand • Ludovico has ordered 18 FADCs and 2 TDCs • Maurizio has ordered 1 TDC • Shaper production should start soon • We should be ready to start with EMCal(KL) / TOF0 / TOF1 / CKOV • For TOF2, we miss • 2 FADCs • 1 TDC (actually, only 12 channels) • For EMCal(SW), we miss even the number of channels… • The commercial agreement with CAEN is to buy 30 FADCs -> Min = 80 ch • Original EMCal Design: 240 channels in total -> Max = 200 ch Jean-Sébastien Graulich

  18. Particle Trigger Technical Design • Work in Progress • The current plan is to use Lecroy Logic Unit 4516 (CAMAC) • 2 in hand, 3 needed (one per TOF station) • 9 available in CERN’s pool, (8 CHF/month, only reduced support) • VME – CAMAC interface available for programming the logic (trivial programming) • CAMAC crates available in Geneva • Time reference for the trigger is the Burst Gate • Present in all trigger condition -> Time reference won’t change (same offline cuts) • Discussion ongoing on the availability of the Burst Gate.. Jean-Sébastien Graulich

  19. Dispatch Panel (in Hand) These 4 channels Going to another splitter

  20. LEFT Pmts OR of 10 slabs UP and DOWN Pmts are not used for the trigger 2 by 2 coincidence RIGHT Pmts

  21. Schedule Milestones • Complete Flash ADC analysis: Nov 2006 • Actually assed in beginning of December • BUT extended to test new shaper prototype with EMCal Pmts -> Feb 2007 • DAQ Test bench including Event builder: Feb 2007 • Delayed by ~ 1 month • Order Hardware for Stage 1: March 2007 • Critical item: Network Switches should be ordered at the end of March • Shaper production process will be launched • Event builder will be ordered in April • Move DDAQ system to RAL: July 2007 • Still reachable Jean-Sébastien Graulich

  22. Summary • DATE software training Completed • FE Electronics for PID has converged to a valid solution achievable for Stage 1 • DAQ test bench is late • Particle Trigger technical design progressing • We still plan to install the DAQ system at RAL in July Jean-Sébastien Graulich